My WebLink
|
Help
|
About
|
Sign Out
08
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2023
>
020723
>
08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/2/2023 1:53:33 PM
Creation date
2/2/2023 1:52:20 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
2/7/2023
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
136
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AUGUSTIN BERNAL MOUNTAIN BIKE TRAIL PROJECT DRAFT INITIAL STUDY <br /> MM-CUL-2 Treatment of Unanticipated Human Remains. In accordance with Section 7050.5 of the <br /> California Health and Safety Code, if human remains are found,work shall halt in that area <br /> and the County Coroner shall be immediately notified of the discovery. No further <br /> excavation or disturbance of the site or any nearby area reasonably suspected to overlie <br /> adjacent remains shall occur until the County Coroner has determined, within 2 working <br /> days of notification of the discovery, if the remains are human in origin. If the County <br /> Coroner determines that the remains are,or are believed to be,Native American,they shall <br /> notify the Native American Heritage Commission in Sacramento within 24 hours. In <br /> accordance with California Public Resources Code Section 5097.98,the Native American <br /> Heritage Commission must immediately notify those persons it believes to be the most <br /> likely descendant from the deceased Native American. The most likely descendant shall <br /> complete their inspection within 48 hours of being granted access to the site. The <br /> designated Native American representative would then determine,in consultation with the <br /> City,the disposition of the human remains. <br /> 3.6 Energy <br /> Less Than <br /> Significant <br /> Potentially Impact With Less Than <br /> Significant Mitigation Significant <br /> Impact Incorporated Impact No Impact <br /> VI. Energy- Would the project: <br /> a) Result in potentially significant <br /> environmental impact due to wasteful, <br /> inefficient,or unnecessary consumption ❑ ❑ ❑ ❑ <br /> of energy resources,during project <br /> construction or operation? <br /> E <br /> lict with or obstruct a state or local <br /> for renewable energy or energy ❑ ❑ ❑ency? <br /> Setting <br /> The proposed project would develop a mountain bike trail within an existing community park. No lighting or <br /> other sources of energy consumption are included in the project,otherthan energy consumption necessary <br /> during project construction. <br /> 12956 <br /> DUDEK 49 April 2022 <br />
The URL can be used to link to this page
Your browser does not support the video tag.