Laserfiche WebLink
AUGUSTIN BERNAL MOUNTAIN BIKE TRAIL PROJECT DRAFT INITIAL STUDY <br /> Impact Discussion <br /> a) Would the project result in potentially significant environmental impact due to wasteful,inefficient, <br /> or unnecessary consumption of energy resources, during project construction or operation? <br /> Construction Energy Use <br /> Electricity <br /> Temporary electric power for as-necessary lighting and electronic equipment would be provided by <br /> Pacific Gas & Electric. The amount of electricity used during construction would be minimal since <br /> typical demand would be from electrically powered hand tools.The electricity used for construction <br /> activities would be temporary and minimal; therefore, project construction would not result in <br /> wasteful, inefficient, or unnecessary consumption of electricity. Impacts would be less than <br /> significant. <br /> Natural Gas <br /> Natural gas is not anticipated to be required during construction of the project. Fuels used for <br /> construction would primarily consist of diesel and gasoline, which are discussed under the <br /> subsection "Petroleum," below. Any minor amounts of natural gas that may be consumed as a <br /> result of project construction would be temporary and negligible and would not have an adverse <br /> effect; therefore, project construction would not result in wasteful, inefficient, or unnecessary <br /> consumption of natural gas. Impacts would be less than significant. <br /> Petroleum <br /> Petroleum would be consumed throughout construction. Fuel consumed by construction <br /> equipment would be the primary energy resource expended over the course of construction. <br /> Transportation of construction materials and construction workers would also result in petroleum <br /> consumption. Heavy-duty construction equipment,vendor trucks,and haul trucks would use diesel <br /> fuel. Construction workers would likely travel to and from the project area in gasoline-powered <br /> vehicles. Construction is expected to take approximately 3 months. Once construction activities <br /> cease, petroleum use from off-road equipment and transportation vehicles would end. Because of <br /> the short-term nature of construction and relatively small scale of the project, the project's <br /> petroleum consumption would be negligible when compared to California's daily total use of <br /> approximately 1.8 million barrels of petroleum.As such, impacts would be less than significant. <br /> Operational Energy Use <br /> Anticipated energy use would primarily be attributed to visitors and maintenance vehicles traveling <br /> to and from the project site.The park is a recreational facility that does not use electricity or natural <br /> gas, and petroleum consumption associated with park visitors would be minimal in comparison <br /> with other types of development,such as commercial and industrial uses.Additionally,the project <br /> site supports an unofficial user-created trail. While construction of an official, appropriately <br /> designed trail is expected to increase use of the trail, the trail would serve a predominantly local <br /> 12956 <br /> DUDEK 50 April 2022 <br />