Laserfiche WebLink
AUGUSTIN BERNAL MOUNTAIN BIKE TRAIL PROJECT DRAFT INITIAL STUDY <br /> geologic and soil stability hazards.Therefore,the project would have a less-than-significant impact <br /> associated with an unstable geologic unit or soil. <br /> d) Would the project be located on expansive soil,as defined in Table 18-1-B of the Uniform Building <br /> Code(1994),creating substantial direct or indirect risks to life or property? <br /> Expansive soils have a potential to undergo significant changes in volume in the form of either <br /> shrinking or swelling due to changes in moisture content. Periodic shrinking and swelling of <br /> expansive soils can cause extensive damage to buildings, other structures, and roads. Expansive <br /> soils are potentially present at or near the surface in areas in northern Pleasanton and along the <br /> northeastern portion of Pleasanton Ridge. As stated above, the project would not construct <br /> structures and would be constructed consistent with the CBC,and local code.Therefore,the project <br /> would have a less-than-significant impact associated with expansive soils. <br /> e) Would the project have soils incapable of adequately supporting the use of septic tanks or <br /> alternative waste water disposal systems where sewers are not available for the disposal of waste <br /> water? <br /> The project would not include restrooms and would not require the use of septic tanks or alternative <br /> wastewater disposal systems.Therefore,the project would have no impact. <br /> f) Would the project directly or indirectly destroy a unique paleontological resource or site or unique <br /> geologic feature? <br /> The project site contains no known paleontological resources or unique geologic features and is <br /> not within an area considered sensitive for these resources. There is some potential to uncover <br /> previously undiscovered paleontological resources during ground disturbing activities; however, <br /> implementation of MM-GEO-2 would ensure that the potential impacts associated with effects to <br /> unique paleontological or geological features would be less than significant. Therefore, impacts <br /> would be less than significant with mitigation incorporated. <br /> Mitigation Measures <br /> MM-GEO-1 Erosion Control. Erosion control measures shall be implemented in accordance with an <br /> erosion control plan.This could include measures for slope stabilization,dust control,and <br /> temporary and permanent erosion control devices/best management practices such as <br /> straw wattles,track out control devices,silt fencing, sediment traps,tarping of stockpiled <br /> soils, revegetation treatments or other measures specified by the erosion and dust control <br /> plan or as determined to be necessary by the project engineer. <br /> MM-GEO-2 Treatment of Unanticipated Paleontological Resources. In the event that paleontological <br /> resources (e.g., fossils) are exposed during construction activities for the project, all <br /> construction work occurring within 50 feet of the find shall immediately stop until a <br /> qualified paleontologist meeting the professional standards of the Society of Vertebrate <br /> Paleontology can evaluate the significance of the find and determine whether or not <br /> additional study is warranted. If the discovery is clearly not significant,the paleontologist <br /> 12956 <br /> DUDEK 55 April 2022 <br />