My WebLink
|
Help
|
About
|
Sign Out
08
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2023
>
020723
>
08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/2/2023 1:53:33 PM
Creation date
2/2/2023 1:52:20 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
2/7/2023
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
136
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AUGUSTIN BERNAL MOUNTAIN BIKE TRAIL PROJECT DRAFT INITIAL STUDY <br /> iv) Landslides? <br /> Landslides are downslope movements of materials including rock, soil, artificial fill, or <br /> combinations of such materials.The size and distance of landslide movements can greatly <br /> vary. The City of Pleasanton has identified areas within the City as higher risk areas for <br /> landslides and this includes the northeastern side of Pleasanton Ridge,which includes the <br /> project site. Recognizing this hazard,the General Plan designates the majority of the land <br /> on Pleasanton Ridge as Agricultural and Grazing and Parks and Recreation.The proposed <br /> project would construct a mountain bike trail to replace an unofficial user-created trail.The <br /> project would not introduce a new use to the Augustin Bernal Community Park, would not <br /> construct any new structures,and would not substantially increase trail use activity within <br /> the park. Thus, the proposed project is consistent with the General Plan in relation to <br /> minimizing exposure of people to risks associated with landslides. <br /> Additionally, project construction would require minor grading, with grading cuts generally <br /> at a maximum of 0.5 feet in depth and a total of approximately 68 cubic yards of earthwork. <br /> All grading would be completed in accordance with the current CBC and City's grading and <br /> erosion prevention ordinance which would ensure that project grading does not create <br /> unstable slopes or increased risks of landslides.Thus,there would be less-than-significant <br /> impacts related to the risk of loss, injury,or death involving landslides. <br /> b) Would the project result in substantial soil erosion or the loss of topsoil? <br /> Grading and construction would be completed in accordance with the CBC and in compliance with <br /> the National Pollutant Discharge Elimination System Waste Discharge Requirements from Small <br /> Municipal Separate Storm Sewer Systems(MS4s). BMPs implemented as part of the project would <br /> include measures to stabilize work areas including fiber wattles, silt fencing, concrete washout <br /> areas,soil stabilizers, revegetation,or other appropriate measures.These measures would ensure <br /> that soil erosion during grading and construction is prevented. The trail design plans also identify <br /> BMPs to be installed at the site during construction to provide long-term post-construction erosion <br /> control. Site stabilization and pollution prevention measures are noted on Sheets N-1 and N-2 of <br /> the trail design plans provided in Appendix A. In addition, implementation of MM-GEO-1 and BMPs <br /> would ensure that erosion is minimized through long-term drainage control, placement of erosion <br /> control mats,and seeding following construction.Therefore,impacts would be lessthan significant <br /> with mitigation incorporated. <br /> C) Would the project be located on a geologic unit or soil that is unstable, or that would become <br /> unstable as a result of the project, and potentially result in on- or off-site landslide, lateral <br /> spreading,subsidence, liquefaction or collapse? <br /> As discussed in response a)above, risks of seismic activity, landslide and liquefaction are known <br /> concerns for the project site. As previously discussed, all grading and construction would be <br /> completed in accordance with the CBC and the Pleasanton Municipal Code which would ensure <br /> that project grading would not create additional geologic and soil stability concerns. Further, the <br /> proposed project would not construct any structures or alter or substantially increase use of the <br /> Augustin Bernal Community Park and thus would not substantially increase exposure of people to <br /> 12956 <br /> DUDEK 54 April 2022 <br />
The URL can be used to link to this page
Your browser does not support the video tag.