My WebLink
|
Help
|
About
|
Sign Out
08
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2023
>
020723
>
08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/2/2023 1:53:33 PM
Creation date
2/2/2023 1:52:20 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
2/7/2023
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
136
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AUGUSTIN BERNAL MOUNTAIN BIKE TRAIL PROJECT DRAFT INITIAL STUDY <br /> The project would result in no impact associated with a safety hazard or noise exposure associated <br /> with airport operations. <br /> f) Would the project impair implementation of or physically interfere with an adopted emergency <br /> response plan or emergency evacuation plan? <br /> The project would construct a new mountain bike trail within an existing community park to replace <br /> an existing user-created trail. As discussed in Sections 3.7(a) and 3.16(a), the project would not <br /> result in a substantial increase in trail use at the park and as discussed in Section 3.17(b), the <br /> project would not generate a substantial volume of traffic that could impede traffic flows during an <br /> emergency response or evacuation event.Additionally,the project does not include and would not <br /> require any modifications to existing roadways that could impede emergency response or <br /> evacuation activities. Construction and operation of the project would not affect an adopted <br /> emergency response plan or emergency evacuation plan; therefore, the project would have no <br /> impact. <br /> g) Would the project expose people or structures, either directly or indirectly, to a significant risk of <br /> loss,injury,or death involving wildland fires? <br /> The project is located adjacent to an urbanized area on a site surrounded with existing community <br /> park.The project site currently supports a variety of natural habitats, including oak woodlands and <br /> chaparral. Trails throughout the park, including the user-created trail that the proposed project <br /> would replace, are frequently used by the general public. The City currently performs vegetation <br /> treatments within the Community Park to maintain defensible space requirements and reduce the <br /> potential for wildfire and would continue to perform these treatments following development of the <br /> new trail.The proposed trail would not increase the risk of wildfire ignition.As discussed in Sections <br /> 3.7 and 3.16, the project would not result in a substantial increase in trail use,thus it would not <br /> substantially increase the number of people who may be exposed to hazards if a wildfire occurred <br /> in the project vicinity. Thus,the project would have a less than significant impact associated with <br /> increases in people's exposure to wildfire hazards and risks. <br /> Mitigation Measures <br /> MM-HAZ-1 Management of Hazardous Materials During Construction. The following measures shall <br /> be implemented prior to and during construction and shall be incorporated into project <br /> plans and specifications. <br /> • All equipment shall be inspected by the contractor for leaks prior to the start of <br /> construction and regularly throughout project construction. Leaks from any <br /> equipment shall be contained and the leak remedied before the equipment is again <br /> used on the site. <br /> • Best management practices for spill prevention shall be incorporated into project <br /> plans and specifications and shall contain measures for secondary containment and <br /> safe handling procedures. <br /> 12956 <br /> DUDEK 63 April 2022 <br />
The URL can be used to link to this page
Your browser does not support the video tag.