My WebLink
|
Help
|
About
|
Sign Out
08
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2023
>
020723
>
08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/2/2023 1:53:33 PM
Creation date
2/2/2023 1:52:20 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
2/7/2023
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
136
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AUGUSTIN BERNAL MOUNTAIN BIKE TRAIL PROJECT DRAFT INITIAL STUDY <br /> Less Than <br /> Significant <br /> Potentially Impact With Less Than <br /> Significant Mitigation Significant <br /> Impact Incorporated Impact No Impact <br /> iii) create or contribute runoff water <br /> which would exceed the <br /> capacity of existing or planned ❑ ❑ ❑ ❑ <br /> stormwater drainage systems or <br /> provide substantial additional <br /> sources of polluted runoff;or <br /> iv) impede or redirect flood flows? ❑ ❑ ❑ <br /> d) In flood hazard,tsunami,or seiche <br /> zones, risk release of pollutants due to ❑ ❑ ❑ <br /> project inundation? <br /> e) Conflict with or obstruct implementation <br /> of a water quality control plan or ❑ ❑ ❑ <br /> sustainable groundwater management <br /> plan? <br /> Setting <br /> The project would construct a mountain bike trail descending the easterly slope of the Pleasanton Ridge. <br /> There are no streams or natural drainage courses within or adjacent to the project site.As shown in Figure <br /> 1, there is one primary drainage slightly north of the project site, within the Augustin Bernal Community <br /> Park.This drainage flows eastward as a tributary to Arroyo de la Laguna,east of Foothill Boulevard.Arroyo <br /> de la Laguna continues south and then west into the City of Fremont,generally along the same alignment <br /> as State Route 84, until it enters Alameda Creek and ultimately the San Francisco Bay. <br /> Impact Discussion <br /> a) Would the project violate any water quality standards or waste discharge requirements or <br /> otherwise substantially degrade surface or ground water quality? <br /> Soil disturbance during grading and construction could potentially result in erosion and <br /> sedimentation of downstream water bodies. Erosion and sedimentation affect water quality and <br /> interfere with photosynthesis; oxygen exchange; and the respiration, growth, and reproduction of <br /> aquatic species. In addition to sediment, other pollutants associated with construction activity <br /> could include heavy metals,oil/grease,fuels,debris/trash from construction-related materials,and <br /> concrete curing compounds.Sediment can also be a carrier for these pollutants if such pollutants <br /> impact on-site soils and are subsequently transported off site. <br /> Because the area of ground disturbance would be less than 1 acre,grading and construction would <br /> not be subject to the State Construction General Permit and would not require completion and <br /> implementation of a Stormwater Pollution Prevention Plan. However, the City would implement <br /> typical BMPs to minimize soil erosion and associated adverse effects to water quality, including <br /> measures to stabilize work areas including fiber wattles, silt fencing, concrete washout areas,soil <br /> 12956 <br /> DUDEK 65 April 2022 <br />
The URL can be used to link to this page
Your browser does not support the video tag.