Laserfiche WebLink
AUGUSTIN BERNAL MOUNTAIN BIKE TRAIL PROJECT DRAFT INITIAL STUDY <br /> Impact Discussion <br /> a) Would the project induce substantial unplanned population growth in an area, either directly(for <br /> example, by proposing new homes and businesses)or indirectly(for example, through extension <br /> of roads or other infrastructure)? <br /> The project would construct a mountain bike trail to replace several existing unofficial user-created <br /> trails.The project would not require extension of any infrastructure into unserved areas that would <br /> promote growth;the project site is within an area of existing urban development already served by <br /> infrastructure. The project would not create new residences or commercial land uses that could <br /> create new employment opportunities.The project would create a local-serving recreational facility <br /> to meet the identified needs of existing City residents consistent with the City's Trails Master Plan. <br /> Since the project would result in no population growth associated with new home construction or <br /> creation of a large number of new jobs,and would not extend infrastructure into new areas,it would <br /> not induce unplanned population growth and thus would result in no impact. <br /> b) Would the project displace substantial numbers of existing people or housing, necessitating the <br /> construction of replacement housing elsewhere? <br /> The project would construct a mountain bike trail to replace several existing unofficial user-created <br /> trails. No housing currently exists on the project site thus no housing would be displaced by the <br /> proposed project.The project would not introduce any new land uses that could displace residents <br /> from existing residential uses in areas adjacent to the project site. Therefore, the project would <br /> result in no impact associated with construction of replacement housing due to displacement of <br /> people or existing housing. <br /> Mitigation Measures <br /> No mitigation measures are required. <br /> 3.15 Public Services <br /> Less Than <br /> Significant <br /> Potentially Impact With Less Than <br /> Significant Mitigation Significant <br /> Impact Incorporated Impact No Impact <br /> XV. PUBLIC SERVICES <br /> a) Would the project result in substantial adverse physical impacts associated with the provision of <br /> new or physically altered governmental facilities, need for new or physically altered governmental <br /> facilities,the construction of which could cause significant environmental impacts, in order to <br /> maintain acceptable service ratios, response times, or other performance objectives for any of the <br /> public services: <br /> Fire protection? ❑ ❑ ❑ <br /> Police protection? ❑ ❑ ❑ <br /> 12956 <br /> DUDEK 74 April 2022 <br />