My WebLink
|
Help
|
About
|
Sign Out
08
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2023
>
020723
>
08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/2/2023 1:53:33 PM
Creation date
2/2/2023 1:52:20 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
2/7/2023
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
136
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AUGUSTIN BERNAL MOUNTAIN BIKE TRAIL PROJECT DRAFT INITIAL STUDY <br /> staging area singly,the total of 110 daily trips would require 55 additional trail users each day.The <br /> City anticipates that the trail would receive much less daily use, particularly during the week.The <br /> net new trips generated by the proposed project would not be significant and not cause a significant <br /> increase in VMT.Therefore,the proposed project's impacts to VMT would be less than significant. <br /> C) Would the project substantially increase hazards due to a geometric design feature (e.g., sharp <br /> curves or dangerous intersections)or incompatible uses(e.g.,farm equipment)? <br /> Access to the project site is provided by Golden Eagle Way. The project does not require any <br /> modifications to Golden Eagle Way or any other public or private roads.The project would expand <br /> the existing recreational uses within Augustin Bernal Community Park but would not introduce any <br /> new uses and therefore would not introduce new types of vehicles to the road network. No other <br /> potential hazards related to roadway or access design features were identified or evaluated. The <br /> project is expected to have no impact associated with hazards due to roadway geometry or <br /> incompatible roadway uses. <br /> d) Would the project result in inadequate emergency access? <br /> Emergency access would be maintained on all public roads at all times during project construction <br /> and operation.As discussed in Section 3.15(a),during operation,the project site would be served <br /> adequately by Golden Eagle Way duringan emergency.The project would not change or reconstruct <br /> existing roadways and would result in no impedimentto existing emergency access in the area.The <br /> project would result in no impact due to inadequate emergency access. <br /> Mitigation Measures <br /> No mitigation measures are required. <br /> 3.18 Tribal Cultural Resources <br /> Less Than <br /> Significant <br /> Potentially Impact With Less Than <br /> Significant Mitigation Significant <br /> Impact Incorporated Impact No impact <br /> XVIII. TRIBAL CULTURAL RESOURCES <br /> Would the project cause a substantial adverse change in the significance of a tribal cultural resource, <br /> defined in Public Resources Code section 21074 as either a site,feature, place,cultural landscape that <br /> is geographically defined in terms of the size and scope of the landscape,sacred place,or object with <br /> cultural value to a California Native American tribe,and that is: <br /> a) Listed or eligible for listing in the <br /> California Register of Historical <br /> Resources,or in a local register of El ® ❑ ❑ <br /> historical resources as defined in <br /> Public Resources Code section <br /> 5020.1(k),or <br /> 12956 <br /> DUDEK 80 April 2022 <br />
The URL can be used to link to this page
Your browser does not support the video tag.