Laserfiche WebLink
Facts in Support of Finding: The following facts and mitigation measures indicate <br />that the impact will be reduced to less than significant. <br />1.Remaining and/or previously unidentified contamination <br />may be present on or below ground surface. Encountering contaminated soil, <br />surface water, and groundwater without taking proper precautions during site <br />remediation could result in the exposure of construction workers to hazardous <br />materials and consequently result in associated significant adverse human health <br />and environmental impacts. <br />2.Implementation of Mitigation Measure 4.G-2 set forth in <br />Table 6-1 of the Final SEIR and listed in the MMRP will ensure that Impact 4.G-2 <br />would be reduced to a less than significant level and is hereby incorporated by <br />reference and described below: <br />4.G-2: The City shall ensure that each project applicant retain a qualified <br />environmental consulting firm to prepare a Phase I environmental site <br />assessment in accordance with ASTM E1527-05 which would ensure that the <br />City is aware of any hazardous materials on the site and can require the right <br />course of action. The Phase I shall determine the presence of recognized <br />environmental conditions and provide recommendations for further investigation, <br />if applicable. Prior to receiving a building or grading permit, project applicant shall <br />provide documentation from overseeing agency (e.g., ACEH or RWQCB) that <br />sites with identified contamination have been remediated to levels where no <br />threat to human health or the environment remains for the proposed uses. <br />Site(s) affected: All <br />Draft SEIR, 4.G-11 to 4.G-13.) <br />Impact 4.G-4 <br />Development facilitated by the General Plan Amendment and rezonings could <br />potentially be located on one or more sites that are included on a list of hazardous materials <br />sites compiled pursuant to Government Code section 65962.5, resulting in a hazard to the <br />public or the environment. <br />The SEIR evaluates the impacts related to the potential for sites proposed for <br />development to be included on a list of hazardous materials sites compiled pursuant to <br />Government Code § 65962.5, resulting in a hazard to the public or the environment. <br />Significance Before Mitigation: Significant <br />Significance After Mitigation: Less than Significant <br />Finding: Changes or alterations have been required in or incorporated into the <br />Project that would avoid or substantially lessen the significant environmental <br />effect as identified in the SEIR. Mitigation Measure 4.G-2 which is required in or <br />incorporated into the Project, will reduce the significant environmental impact to a <br />less than significant level.