Laserfiche WebLink
mitigation measures have been adopted as part of or imposed upon the Project. The imposition <br />of these measures will reduce the identified impacts, but not to a less-than-significant level. The <br />City Council finds that it is not feasible to fully mitigate these Project impacts. <br />The City Council has also considered all potentially feasible alternatives to the <br />Project. The City Council finds that there are no feasible alternatives that would reduce the <br />above significant and unavoidable impacts to a less-than-significant level. <br />The Project's impacts discussed above therefore remain significant and <br />unavoidable. <br />C. Overriding Considerations <br />After review of the entire administrative record, including, but not limited to, the <br />Final SEIR, the staff report, and the oral and written testimony and evidence presented at public <br />hearings, the City Council finds that specific economic, legal, social, technological and other <br />anticipated benefits of the Project outweigh the significant and unavoidable impacts, and <br />therefore justify the approval of this Project notwithstanding the identified significant and <br />unavoidable impacts. (Pub. Resources Code, § 21081; CEQA Guidelines, § 15093.) The <br />benefits are addressed in detail in Section II.D below. <br />The City Council specifically adopts and makes this Statement of Overriding <br />Considerations that this Project has eliminated or substantially lessened all significant effects on <br />the environment where feasible (including the incorporation of feasible mitigation measures), <br />and finds that the remaining significant unavoidable impacts of the Project, which are described <br />above in Section II.A, are acceptable because the benefits of the Project set forth below in <br />Section II.D outweigh them. The City Council finds that each of the overriding considerations <br />expressed as benefits and set forth below in Section II.D constitutes a separate and <br />independent ground for such a finding. Any one of the reasons for approval cited below is <br />sufficient to justify approval of the Project. Thus, even if a court were to conclude that not every <br />reason is supported by substantial evidence, the City Council will stand by its determination that <br />each individual reason is sufficient by itself. The substantial evidence supporting the various <br />benefits can be found in the preceding findings, which are incorporated by reference into this <br />Section II, and in the documents found in the Record of Proceedings, as defined in Section I.D. <br />D. Benefits of the Project <br />The City Council has considered the SEIR, the public record of proceedings on <br />the proposed Project and other written materials presented to and prepared by the City, as well <br />as oral and written testimony received, and does hereby determine that implementation of the <br />Project as specifically provided in the Project documents would result in the following substantial <br />public benefits: <br />1. The Project Would Enable the City to Meet its Regional Housing Needs <br />Obligation <br />The Housing Element and its associated General Plan amendments and <br />rezonings provide sites that can be developed for a minimum of 2,088 residential units at a <br />minimum density of 30 units per acre, the density at which the State of California considers to <br />be appropriate for providing housing affordable to households with very low and low incomes. <br />When combined with the 350 units associated with the previously approved Windstar project