My WebLink
|
Help
|
About
|
Sign Out
3_Exhibit C
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2020 - PRESENT
>
2023
>
02-22
>
3_Exhibit C
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/16/2023 1:30:15 PM
Creation date
2/16/2023 1:15:47 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
2/22/2023
DESTRUCT DATE
15Y
Document Relationships
3
(Message)
Path:
\BOARDS AND COMMISSIONS\PLANNING\AGENDA PACKETS\2020 - PRESENT\2023\02-22
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1857
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6.Mitigation monnonng and Repoding Program <br />TABLE 6-1(Continued) <br />MITIGATION MONITORING AND REPORTING PROGRAM <br />Sites) Implementation Monitoring Monitoring and Reporting Monitoring Verification of <br />Mitigation Measures Affected Procedures Responsibility Action Schedule Compliance <br />any ground-disturbing activity or vegetation removal.Surveys <br />will include all line-of-sight trees within 500 feet(for raptors) <br />and all vegetation(including bare ground)within 250 feet for <br />all other species. <br />Based on the results of the surveys.avoidance procedures i <br />will be adopted,if necessary,on a case-by-case basis. <br />These may Include construction buffer areas(up to several <br />hundred feet in the case of raptors)or seasonal avoidance. <br />Bird nests initiated during construction are presumed to be <br />unaffected,and no buffer would necessary except to avoid <br />direct destruction of a nest or mortality of nestlings. <br />If preconstNdion surveys indicate that nests are inactive or <br />potential habitat is unoccupied during the construction <br />period,no further mitigation Is required.Trees and shrubs <br />that have been determined to be unoccupied by nesting or <br />other special-status birds may be pruned or removed. <br />Mitigation Measure 4.0-lb:Pre-Construction Bat Surveys. 6,8.9,10, Include condition of City of Pleasanton City of Pleasanton City City Council- Verified by: <br />Conditions of approval for building and grading permits issued 13,20,21 approval.City Council Council-Include condition. Prior to PUD I <br />for demolition and construction on Sites 8,8,9,10,13,20,and <br />approval. • <br />21 shell include a requirement for pre-construction special- <br />If large trees are to be Community Community Development <br />status bat surveys when large trees are to be removed or <br />removed or if vacant Development Department-Verify Community <br />underutilized or vacant buildings are to be demolished.If active <br />buildings are to be Department inclusion of condition on Development • <br />day or night roosts are found,the bat biologist shall take actions <br />demolished,protect I construction plans.If large Department- <br />to make such roosts unsuitable habitat prior to tree removal or applicant will hire a qualified trees are to be removed or If Prior to issuance <br />building demolition.A no-disturbance buffer of 100 feet shall be biologist and identify vacant buildings are to be of grading or <br />created around active bat roosts being used for maternity or <br />measures in the demolished.review and building permit, I <br />hibernation purposes.Bat roasts Initiated during construction <br />construction plan(s)to approve qualified biologist whichever is ' <br />are presumed to be unaffected,and no buffer would necessary <br />reduce impacts to bats and and construction plan that sooner. <br />their roosts consistent with includes bat avoidance. <br />Inspect see <br />Nis measure, Inspect if buffer required. <br />during <br />construction in I <br />ensurecompliance with I <br />projectconstruction <br />plans. <br />Mitigation Measure 4.0-1c:Burrowing Owl Surveys. 18,20 Project applicant will Community Review and approve Prior to issuance Verified by: <br />Conditions of approval for building and grading permits at Site implement measure prior to Development qualified biologist. of grading or <br />18 and Site 20 shalt require the project applicant to implement and donne construction as Department Verify survey(s)conducted. building permit. <br />the following measures prior to construction initiation. required. If suitable habitat present, whichever is Date: <br />65 ._.._ <br />rnn5I Pig Mnnemnl we Rozonvigsspat <br />Ean/r 201/ <br />real SWdemsnW EmimnnwnW mM Rawl <br />dcmmOn lot r
The URL can be used to link to this page
Your browser does not support the video tag.