Laserfiche WebLink
6 M ligation abnitonng and Reporting Program <br />TABLE 6-1(Continued) <br />MITIGATION MONITORING AND REPORTING PROGRAM <br />Site(e) implementation Monitoring Monitoring and Reporting Monitoring Verification of <br />Mitigation Measures Affected Procedures Responsibility Action Schedule Compliance <br />Development Department for review and approval.The applicant i compliance with <br />shall implement the approved HRA mitigation measure project <br />recommendations,if any,in order to reduce exposure to TACs constructon <br />below BAADMDS threshold of significance at the time of project plans. <br />approval.Housing units shall not be sited in any incompatible <br />areas,such as if the HRA finds TAO exposure that cannot be City Council- <br />reduced to less than significant,or if required mitigation cannot <br />Prior <br />be feasibly implemented. <br />approval <br />Outdoor Air Quality-To the maximum extent practicable, <br />individual and common exterior open space,including <br />playgrounds,patios,and decks,shall either be shielded from the <br />source of air pollution by buildings or otherwise buffered to <br />further reduce air pollution for project occupants. <br />Mitigation Measure 4.13-5c If odor complaints associated with 6,8,11,141 if odor complaints received Community TraCk odor complaints. Ongoing until Verified by: <br />the solid waste transfer station operations are received from 1 from sites 6,8.11 or 14.the Development transfer station is <br />tuture residences of the potential sites for rezoning(Sites 6.8, I City will work with the Department If applicable,coordinate relocated. <br />11,and 14).the City shall work with the transfer station owner(s) transfer station owner(s)and with the owner(s)and <br />and operator(s)to ensure that odors are minimized operator(s)to redu odors <br />operator(s)to reduce odors. Dare: <br />ce <br />appropriately. appropriatey. <br />C.Biological Resources <br />Mitigation Measure 4,0-Is:Pre-construction Breeding Bird 1-4, The project applicant will 'Community Review and approve a No more than 14 i Verified by: <br />Surveys.The City shall ensure that prior to development of all prepare construction plans Development qualified biologist. days before start I <br />potential sites(or rezoning(Sites 1.4,6-11,13,14.and 16-21) 8-11,13.14, that incorporate pre.Department or restart of <br />and each phase of project activities that have the potential to 16-21 <br />construction surveys and <br />Review pre-construction <br />construction <br />result in impacts on breeding birds,the project applicant shall buffer zones.If required, 1 survey reports. during the months I Defe: <br />lake the following steps to avoid direct losses of nests,eggs, avoidance procedures will be i II active nests are found, of February to <br />and nestlings and indirect impacts to avian breeding success: implemented inspect construction site to August. <br />if grading or constructlan activities occur only during the non- The project applicant will hire confirm buffer zones. <br />breeding season,between August 31 and February 1,no a qualified biologist and the <br />surveys will be required.project applicant Its <br />contractor(s)shall engage <br />Pruning and removal of trees and othervegetation,including the qualified biologist to <br />grading of grasslands.should oo ur whenever feasible,conduct precanstructlon <br />outside the breeding season(February 1 through August 31). surveys as described. <br />During the breeding bird season(February I through August <br />31)a qualified biologist will survey activity sites for nesting <br />ra riots and• sserine birds not more than 14 d - •rior to <br />Owena Rvi Mxrenmi end eezo,,e 6-4 EsA I ztwaie <br />Peal Sgwwness Emaron me Imam gnat Oenmber 1011