Laserfiche WebLink
Project Construction Assumptions <br />CalEEMod output file:Pleasanton Stoneridge Mall Residential - Alameda County, Annual <br />Time stamp:Date: 12/6/2022 12:04 PM <br />Construction Schedule Phase Name Phase Type Start Date End Date <br />Num Days <br />Week Num Days <br />Demolition Demolition 6/19/2023 7/14/2023 5 20 <br />Site Preparation Site Preparation 7/15/2023 7/28/2023 5 10 <br />Grading Grading 7/29/2023 8/25/2023 5 20 <br />Building Construction Building Construction 8/26/2023 4/4/2025 5 420 <br />Paving Paving 4/5/2025 5/2/2025 5 20 <br />Architectural Coating Architectural Coating 5/3/2025 10/17/2025 5 120 <br />Phase Name Total Trips <br />Worker Trip Number <br />Vendor Trip <br />Number <br />Hauling Trip <br />Number <br />Worker Trip <br />Length <br />Vendor <br />Trip Length <br />Hauling Trip <br />Length Vendor Vehicle Class <br />Num <br />Days <br />Worker Trip <br />Number <br />Vendor Trip <br />Number <br />Hauling Trip <br />Number Worker Trips Vendor Trips <br />Hauling <br />Trips Worker Trips Vendor Trips <br />Hauling <br />Trips <br />Demolition 15 0 877 10.8 7.3 20 HDT_Mix 20 300 0 877 3,240 0 17,540 117.59 0 149 <br />Site Preparation 18 0 0 10.8 7.3 20 HDT_Mix 10 180 0 0 1,944 0 0 70.55 0 0 <br />Grading 15 0 2873 10.8 7.3 20 HDT_Mix 20 300 0 2,873 3,240 0 57,460 117.59 0 487 <br />Building Construction 399 93 0 10.8 7.3 20 HDT_Mix 420 167,580 39,060 0 1,809,864 285,138 0 65,684.57 34,632 0 <br />Paving 15 0 0 10.8 7.3 20 HDT_Mix 20 300 0 0 3,240 0 0 117.59 0 0 <br />Architectural Coating 80 0 0 10.8 7.3 20 HDT_Mix 120 9,600 0 0 103,680 0 0 3,762.81 0 0 <br />Total Construction VMT (miles) <br />2,285,346 <br />Total Fuel Consumption (gallons) <br />105,139 <br />Fuel Consumption (gallons)Trips per Day Trips per Phase VMT per Phase <br />Appendix B Page 52