My WebLink
|
Help
|
About
|
Sign Out
3_Exhibit C
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2020 - PRESENT
>
2023
>
02-22
>
3_Exhibit C
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/16/2023 1:30:15 PM
Creation date
2/16/2023 1:15:47 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
2/22/2023
DESTRUCT DATE
15Y
Document Relationships
3
(Message)
Path:
\BOARDS AND COMMISSIONS\PLANNING\AGENDA PACKETS\2020 - PRESENT\2023\02-22
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1857
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Construction Equipment Fuel Calculation <br />On-site <br />Source: AQ/GHG Appendix, CalEEMod Output <br />Pleasanton Stoneridge Mall Residential - Alameda County, Annual <br />Date: 12/6/2022 12:04 PM <br />Construction Schedule Phase Name Phase Type Start Date End Date <br />Num Days <br />Week Num Days <br />Demolition Demolition 6/19/2023 7/14/2023 5 20 <br />Site Preparation Site Preparation 7/15/2023 7/28/2023 5 10 <br />Grading Grading 7/29/2023 8/25/2023 5 20 <br />Building Construction Building Construction 8/26/2023 4/4/2025 5 420 6/19/2023 <br />Paving Paving 4/5/2025 5/2/2025 5 20 10/17/2025 <br />Architectural Coating Architectural Coating 5/3/2025 10/17/2025 5 120 <br />Construction Equipment Phase Name Offroad Equipment Type Amount Usage Hours Horse Power <br />Load <br />Factor <br />Number of <br />Days HP Hours Diesel Fuel Usage <br />Demolition Concrete/Industrial Saws 1 8 81 0.73 20 9,460.80 473.04 <br />Demolition Excavators 3 8 158 0.38 20 28,819.20 1,440.96 <br />Demolition Rubber Tired Dozers 2 8 247 0.4 20 31,616.00 1,580.80 <br />Site Preparation Rubber Tired Dozers 3 8 247 0.4 3 7,113.60 355.68 <br />Site Preparation Tractors/Loaders/Backhoes 4 8 97 0.37 3 3,445.44 172.27 <br />Grading Excavators 1 8 158 0.38 3 1,440.96 72.05 <br />Grading Graders 1 8 187 0.41 6 3,680.16 184.01 <br />Grading Rubber Tired Dozers 1 8 247 0.4 6 4,742.40 237.12 <br />Grading Tractors/Loaders/Backhoes 3 8 97 0.37 6 5,168.16 258.41 <br />Building Construction Cranes 1 7 231 0.29 220 103,164.60 5,158.23 <br />Building Construction Forklifts 3 8 89 0.2 220 93,984.00 4,699.20 <br />Building Construction Generator Sets 1 8 84 0.74 220 109,401.60 5,470.08 <br />Building Construction Tractors/Loaders/Backhoes 3 7 97 0.37 220 165,811.80 8,290.59 <br />Building Construction Welders 1 8 46 0.45 220 36,432.00 1,821.60 <br />Paving Pavers 2 8 130 0.42 10 8,736.00 436.80 <br />Paving Paving Equipment 2 8 132 0.36 10 7,603.20 380.16 <br />Paving Rollers 2 8 80 0.38 10 4,864.00 243.20 <br />Coating Air Compressors 1 6 78 0.48 10 2,246.40 112.32 <br /> Construction Equipment Fuel Consumption 31,386.52 gallons <br />Notes: <br />Equipment assumptions are provided in the CalEEMod output files. <br />Fuel usage estimate of 0.05 gallons of diesel fuel per horsepower-hour is from the SCAQMD CEQA Air Quality Handbook, Table A9-3E. <br />South Coast Air Quality Management District. 1993. Air Quality Handbook, Table A9-3E. <br />Website: http://www.aqmd.gov/home/rules-compliance/ceqa/air-quality-analysis-handbook. Accessed November 10, 2022. <br />Appendix B Page 53
The URL can be used to link to this page
Your browser does not support the video tag.