Laserfiche WebLink
Ordinance No. <br /> Page 28 <br /> 80. EXCAVATION SAFETY: All excavations must be performed in conformance with <br /> California Government Code Section 4216 et seq. No excavation shall occur until proper <br /> notice is provided to Underground Service Alert (usanorth811.org) by calling either 811 <br /> or 800-642-2444 at least 72-hours prior to the work so buried utilities can be marked. All <br /> excavations shall be covered or barricaded to prevent entry when work is inactive. Open <br /> excavations in the public right-of-way must be covered by skid-resistant steel plates that <br /> are firmly affixed to the surface with leading edges ramped. Excavations approximate <br /> five feet and deeper require a protective system as defined by Cal-OSHA. If a shoring <br /> system or trench boxes will be utilized as the protective system, said system shall either <br /> be manufactured and installed according to manufacturer recommendations, or <br /> designed by a registered professional engineer and installed according to approved <br /> plans. No excavation shall be performed atop or adjacent to a high-risk facility until <br /> authorized by the owner of the facility. High-risk facilities are defined as gas transmission <br /> pipelines and hazardous liquid pipelines as regulated by the U.S. Department of <br /> Transportation Pipeline and Hazardous Materials Safety Administration (US DOT <br /> PHMSA) (Address this condition during construction) <br /> 81. POLLUTANT REDUCTION IN STORMWATER: At no time during construction of the <br /> project shall pollutants be allowed to enter, clog, or contaminate storm drain pipe <br /> networks or open stormwater channels in violation of Pleasanton Municipal Code <br /> §9.14.080 et seq. The applicant shall contain all trash and debris for proper disposal to <br /> authorized landfills or recyclers. Erosion control features shall be deployed during the <br /> rainy season that extends from October 1 to April 15 each year, or any time rain is <br /> forecast outside of this period. Best Management Practices (BMPs) shall be strictly <br /> followed. Street sweepers must be employed if soil or debris is tracked onto the public <br /> roads from vehicles exiting the site. Standard BMPs are available from the California <br /> Stormwater Quality Association (CASQA), the United States Environmental Protection <br /> Agency (EPA), Caltrans, and others. Notes and/or illustrations shall be added to the <br /> plans that describe the BMPs to be utilized during construction. The use of <br /> manufactured erosion control woven blankets and straw wattles that utilize plastic <br /> monofilament netting is specifically prohibited. (Address this condition during <br /> construction) <br /> 82. SWPPP REPORTING: Copies of any monitoring and/or sampling reports required by <br /> the stormwater pollution prevention plan (SWPPP) and submitted by the Legally <br /> Responsible Person (LRP) to the State of California's SMARTS database shall also be <br /> submitted to the City of Pleasanton inspector assigned to the project. The LRP shall also <br /> submit to the City a copy of the required Annual Report no later than September 1 of <br /> each year that construction is active or when erosion control features have been <br /> deployed. The report must include a summary of all sampling and analysis performed <br /> (Risk Levels 2 and 3 only), a log of all inspections performed including Rain Event Action <br /> Plans (REAP), a summary of any required corrective actions taken, and a summary of <br /> any violations. (Address this condition during construction) <br /> 83. DUST CONTROL: Dust control measures must be employed during all phases of <br /> construction to prevent airborne nuisance to neighboring properties. All stockpiles or <br /> unused materials that can create dust shall be covered or removed. Exposed soil areas <br /> shall be routinely watered until surfacing materials or landscaping is installed. Use of <br /> dust palliatives shall conform to Caltrans Standard Specification Section 18. Any <br /> damage caused by airborne dust to neighboring properties shall be cleaned with costs <br /> paid by the applicant. If the applicant fails the address dust as directed by the City, the <br /> City shall have the right to enter the property to effectuate the correction, with all costs <br />