My WebLink
|
Help
|
About
|
Sign Out
13
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2023
>
032123
>
13
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/16/2023 9:01:39 AM
Creation date
3/16/2023 8:39:31 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
3/21/2023
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
894
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
paid by the applicant or levied as a lien against the applicant's property. (Address this <br /> condition during construction) <br /> 84. PROPERTY NUISANCE: At no time during construction of the project shall the <br /> condition of the property become a nuisance as defined in Pleasanton Municipal Code <br /> §9.28.020. The City shall have the right to inspect the property for conditions that violate <br /> the code standard. If a nuisance is found, the applicant shall immediately submit a plan <br /> of correction. Depending on the severity of the nuisance, the City may suspend all <br /> construction work until the condition is corrected. Any of the following conditions shall be <br /> considered severe: Leaking chemicals that can cause environmental damage; open <br /> excavations or any excavation deeper than approximately four feet that lacks proper <br /> shoring; unsecured materials that can fall to the ground causing damage or injury; open <br /> or exposed utilities that could cause electrical shock or contamination of sewer, potable <br /> water systems, groundwater wells, or storm drainage networks. If the applicant fails the <br /> address the nuisance as directed by the City, the City shall have the right to enter the <br /> property to effectuate the correction, with all costs paid by the applicant or levied as a <br /> lien against the applicant's property. (Address this condition during construction) <br /> 85. NOISE: Construction noise is regulated under Pleasanton Municipal Code Chapter <br /> 9.04. Noise is prohibited outside of the hours of 8 a.m. and 8 p.m. daily except Sundays <br /> and holidays when noise is prohibited outside the hours of 10 a.m. and 6 p.m. Noise is <br /> defined as a level exceeding 83 dBA at a distance of approximately 25 feet or 86 dBA at <br /> any point beyond the boundary of the property under construction. If the applicant fails <br /> the address the noise as directed by the City, the City shall have the right to enter the <br /> property to effectuate the correction, with all costs paid by the applicant or levied as a <br /> lien against the applicant's property. Exceptions to these regulations require a special <br /> permit granted by the City for circumstances when strict compliance would be <br /> impractical or unreasonable, and contingent upon proper noticing to surrounding <br /> property owners that includes the dates and times when noise levels will be exceeded <br /> and the specific reasons why an exception to the regulation has been granted. (Address <br /> this condition during construction) <br /> 86. DROUGHT RESTRICTIONS: If the City Council declares a drought during a time when <br /> this development is under construction, as described in §9.30.010 et seq. of the <br /> Pleasanton Municipal Code, the applicant shall utilize only recycled water under Stage 1 <br /> or greater restrictions for all non-potable construction-related water needs. Recycled <br /> water is available at designated locations within the City, subject to the applicant's <br /> receipt of a temporary hydrant meter from the Operations Service Center located at <br /> 3333 Busch Road. The applicant is responsible for all water costs based on current <br /> billing rates. (Address this condition during construction) <br /> 87. GEOTECHNICAL FINAL REPORT: At the conclusion of construction, the applicant shall <br /> submit to the City a final report from the Geotechnical Engineer or Certified Engineering <br /> Geologist testifying to the successful completion of all material testing and/or <br /> observation work performed. The final report must provide assurance that all <br /> recommendations had been strictly followed. The applicant shall bear all costs <br /> associated with this condition. (Address this condition prior to acceptance of <br /> improvement or issuance of an Occupancy Permit) <br />
The URL can be used to link to this page
Your browser does not support the video tag.