Laserfiche WebLink
The number, location and type of bicycle racks shall be shown on the building permit <br /> plans and shall be subject to review and approval by the City Traffic Engineer prior to <br /> issuance of building permits. <br /> Traffic Control <br /> 132. TRAFFIC CONTROL Plan (TCP): A comprehensive traffic control plan shall be <br /> submitted to the City Traffic Engineer for review and approval. Best management <br /> practices to minimize traffic impacts shall be used during construction, including <br /> scheduling of major truck trips and deliveries, to avoid peak travel hours. The TCP shall <br /> have proper lane closure procedures such as flagger stations, signage, cones, and other <br /> warning devices implemented during construction. The TCP shall also include time of <br /> day/hours of lane closures and total number of days. <br /> 133. TRUCK ROUTES: The haul route for all materials to and from the project site shall be <br /> reviewed and approved by the City Traffic Engineer prior to building permit issuance and <br /> shall include the provision to monitor the street surfaces used for the haul route so that <br /> any damage and debris attributable to the haul trucks is identified and corrected at the <br /> expense of the applicant. <br /> 134. TRAFFIC SIGNAGE AND STRIPING —ON SITE: All on site traffic related signage and <br /> striping shall be included in the building permits plans for review and approval by the <br /> City Traffic Engineer prior to building permit issuance. <br /> 135. TRAFFIC SIGNAGE AND STRIPING —OFF SITE: All off site traffic related signage and <br /> striping shall be included in the improvement plans for review and approval by the City <br /> Traffic Engineer prior to permit issuance. <br /> END <br />