Laserfiche WebLink
City of Pleasanton—Stoneridge Mall Residential Project <br />Section 15183 Checklist/15164 Addendum Mitigation Monitoring and Reporting Program <br /> <br /> <br />FirstCarbon Solutions 3 <br />https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2148/21480017/MMRP/21480017 Stoneridge Mall Residential Project MMRP (002)_Updated.docx <br />Table 1: Stoneridge Mall Residential Project Mitigation Monitoring and Reporting Program <br />Mitigation Measures Method of Verification Timing of Verification <br />Responsible for <br />Verification <br />Verification of Completion <br />Date Initial <br />III. Air Quality <br />Prior EIR MM 4.B-1a: Prior to the issuance of a grading or <br />building permit, whichever is sooner, the project applicant for a <br />potential site for rezoning shall submit an air quality <br />construction plan detailing the proposed air quality <br />construction measures related to the project such as <br />construction phasing, construction equipment, and dust <br />control measures, and such plan shall be approved by the <br />Director of Community Development. Air quality construction <br />measures shall include Basic Construction Mitigation Measures <br />(BAAQMD, May 2011) and, where construction-related <br />emissions would exceed the applicable thresholds, Additional <br />Construction Mitigation Measures (BAAQMD, May 2011) shall <br />be instituted. The air quality construction plan shall be <br />included on all grading, utility, building, landscaping, and <br />improvement plans during all phases of construction. <br />Incorporation into project <br />construction documents, <br />including all grading, <br />utility, building, <br />landscaping, and <br />improvement plans; the <br />City of Pleasanton <br />Building & Safety <br />Inspection Division shall <br />inspect the worksite <br />regularly to ensure the <br />construction measures <br />are implemented. <br />Prior to the issuance <br />of a grading or <br />building permit, <br />whichever is sooner. <br />City of Pleasanton <br />Community <br />Development <br />Department <br /> <br />Prior EIR MM 4.B-4: On project sites where screening <br />thresholds are exceeded, the following measures shall be <br />implemented for development on all the potential sites for <br />rezoning to reduce exposure to TACs and improve indoor and <br />outdoor air quality: <br />a. Indoor Air Quality. In accordance with the recommendations <br />of BAAQMD, appropriate measures shall be incorporated <br />into site and/or building design to reduce the potential <br />health risk due to exposure of sensitive receptors to TACs to <br />a less than significant level. <br />• Project applicants shall retain a qualified air quality <br />consultant to prepare a Health Risk Assessment (HRA) in <br />accordance with the BAAQMD requirements to <br />determine the exposure of project <br />residents/occupants/users to air pollutants prior to PUD <br />Preparation of Health Risk <br />Assessment (HRA) by a <br />qualified air quality <br />consultant for individual <br />projects and <br />incorporation of <br />appropriate measures <br />recommended by <br />BAAQMD during project <br />design and operation, as <br />applicable. Submittal of <br />HRA to City of Pleasanton <br />Community Development <br />Department, Planning <br />Prior to issuance of <br />grading permit, or <br />issuance of a building <br />permit, whichever is <br />sooner. <br />City of Pleasanton <br />Community <br />Development <br />Department, <br />Planning Division <br />