Laserfiche WebLink
City of Pleasanton—Stoneridge Mall Residential Project <br />Section 15183 Checklist/15164 Addendum Mitigation Monitoring and Reporting Program <br /> <br /> <br />FirstCarbon Solutions 4 <br />https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2148/21480017/MMRP/21480017 Stoneridge Mall Residential Project MMRP (002)_Updated.docx <br />Mitigation Measures Method of Verification Timing of Verification <br />Responsible for <br />Verification <br />Verification of Completion <br />Date Initial <br />approval. The HRA shall be submitted to the Community <br />Development Department for review and approval. The <br />applicant shall implement the approved HRA mitigation <br />measure recommendations, if any, to reduce exposure to <br />TACs below BAAQMDs threshold of significance at the <br />time of project approval. <br />b. Outdoor Air Quality. To the maximum extent practicable, <br />individual, and common exterior open space, including <br />playgrounds, patios, and decks, shall either be shielded from <br />the source of air pollution by buildings or otherwise buffered <br />to further reduce air pollution for project occupants. <br />Division for review and <br />approval. <br />IV. Biological Resources <br />Prior EIR MM 4.C-1a: Pre-construction Breeding Bird Surveys <br />The City shall ensure that prior to development of all potential <br />sites for rezoning (Sites 1-4, 6-11, 13, 14, and 16-21) and each <br />phase of project activities that have the potential to result in <br />impacts on breeding birds, the project applicant shall take the <br />following steps to avoid direct losses of nests, eggs, and <br />nestlings and indirect impacts to avian breeding success: <br />• If grading or construction activities occur only during the <br />nonbreeding season, between August 31 and February 1, no <br />surveys will be required. <br />• Pruning and removal of trees and other vegetation, including <br />grading of grasslands, should occur whenever feasible, <br />outside the breeding season (February 1 through August 31). <br />• During the breeding bird season (February 1 through August <br />31) a qualified Biologist will survey activity sites for nesting <br />raptors and passerine birds not more than 14 days prior to <br />any ground-disturbing activity or vegetation removal. <br />Surveys will include all line-of-sight trees within 500 feet (for <br />raptors) and all vegetation (including bare ground) within <br />250 feet for all other species. <br />Pre-construction surveys <br />for nesting raptors <br />passerine birds to be <br />completed by a qualified <br />Biologist and submittal of <br />survey documents to the <br />City of Pleasanton <br />Community Development <br />Department, Planning <br />Division for review and <br />approval; avoidance <br />procedures if survey <br />results determine that <br />nesting raptors and <br />passerine birds are <br />present. <br />No more than 14 <br />days prior to the <br />start of ground- <br />disturbing activities <br />or vegetation <br />removal (if <br />construction occurs <br />between February 1 <br />through August 31). <br />Qualified Biologist; <br />City of Pleasanton <br />Community <br />Development <br />Department, <br />Planning Division <br />