My WebLink
|
Help
|
About
|
Sign Out
RES 231376 Exhibit A - Addendum and Mitigation Monitoring and Reporting Plan (MMRP)
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
2020-present
>
2023
>
RES 231376 Exhibit A - Addendum and Mitigation Monitoring and Reporting Plan (MMRP)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/5/2023 9:05:52 AM
Creation date
4/5/2023 8:52:16 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
3/21/2023
DESTRUCT DATE
PERMANENT
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1857
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The Project would not create a significantly adverse impairment to the <br />implementation of or physically interfere with an adopted emergency response plan or <br />emergency evacuation plan. (Draft SEIR, pp. 4.G-18 to 4.G-19; Impact 4.G-7.) <br />The Project would not create a significantly risk of loss, injury or death involving <br />wildland fires. (Draft SEIR, pp. 4.G-19 to 4.G-20; Impact 4.G-8.) <br />The Project would not result in a cumulatively considerable adverse hazard or <br />contribute to a cumulative hazardous materials impact. (Draft SEIR, p. 4.G-21; Impact 4.G-9.) <br />7. Hydrology and Water Quality <br />The Project would not result in any direct or cumulatively considerable significant <br />adverse affects to hydrological resources or water quality. (Draft SEIR, pp. 4.H-16 to 4.H-24; <br />Impacts 4.H-1 through 4.H-6.) <br />8. Land Use and Planning <br />The Project would not result in any direct or cumulatively considerable significant <br />adverse land use and planning impacts. (Draft SEIR, pp. 4.1-7 to 4.1-12; Impacts 4.1-1 through <br />4.1-4.) <br />9. Noise <br />The Project would not result in significant adverse impacts associated with the <br />exposure of persons to or generation of excessive groundborne vibration or groundborne noise <br />levels associated with train pass-by events. (Draft SEIR, pp. 4.J-20 to 4.J-21; Impact 4.J-4.) <br />The Project would not have a cumulatively considerable adverse hazard or <br />contribute to a cumulative construction noise impact at noise-sensitive receptors. (Draft SEIR, p. <br />4.J-29; Impact 4.J-8.) <br />10. Population and Housing <br />The Project would not result in any direct or cumulatively considerable significant <br />adverse population and housing impacts. (Draft SEIR, pp. 4.K-7 to 4.K-13; Impacts 4.K-1 <br />through 4.K-4.) <br />11. Public Service and Utilities <br />The Project would not create significant adverse impacts associated with the <br />provision of fire or police protection services or to schools. (Draft SEIR, pp. 4.L-11 to 4.L-13; <br />Impact 4.L-1.) <br />The Project would not result in significant adverse impacts associated with the <br />construction of wastewater treatment facilities or exceedance of wastewater treatment capacity. <br />Draft SEIR, pp. 4.L-16 to 4.L-17; Impact 4.L-3.) <br />The Project would not result in significant adverse solid waste impacts. (Draft <br />SEIR, pp. 4.L-18 to 4.L-19; Impact 4.L-4.) <br />The project would not result in any cumulatively considerable adverse impact <br />associated with an increased demand for utilities services. (Draft SEIR, p. 4.L-19; Impact 4.L-5.)
The URL can be used to link to this page
Your browser does not support the video tag.