My WebLink
|
Help
|
About
|
Sign Out
RES 231376 Exhibit A - Addendum and Mitigation Monitoring and Reporting Plan (MMRP)
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
2020-present
>
2023
>
RES 231376 Exhibit A - Addendum and Mitigation Monitoring and Reporting Plan (MMRP)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/5/2023 9:05:52 AM
Creation date
4/5/2023 8:52:16 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
3/21/2023
DESTRUCT DATE
PERMANENT
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1857
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
12. Recreation <br />The Project would not result in any direct or cumulatively considerable significant <br />adverse recreation impacts. (Draft SEIR, pp. 4.M-8 to 4.M-11; Impacts 4.M-1 through 4.M-3.) <br />13. Transportation and Traffic <br />The Project would not result in any impacts related to changes in air traffic <br />patters. (Draft SEIR, pp. 4.N-14 to 4.N-16.) <br />The Project would not result in significant adverse traffic impacts at the local <br />study intersections under existing plus Project conditions. (Draft SEIR, pp. 4.N-16 to 4.N-20; <br />Impact 4.N-1.) <br />The Project would not result in significant adverse traffic safety hazards for <br />vehicles, bicyclists and pedestrians. (Draft SEIR, pp. 4.N-20 to 4.N-21; Impact 4.N-2.) <br />The Project would not result in significant adverse traffic impacts related to <br />service calls for emergency vehicles. (Draft SEIR, pp. 4.N-21 to 4.N-22; Impact 4.N-3.) <br />The Project would not result in significant adverse traffic impacts related to the <br />creation of any inconsistencies with adopted policies, plans, and programs supporting <br />alternative transportation. (Draft SEIR, pp. 4.N-22 to 4.N-24; Impact 4.N-4.) <br />The Project would not result in significant adverse temporary construction traffic <br />impacts. (Draft SEIR, pp. 4.N-24 to 4.N-25; Impact 4.N-5.) <br />The Project would not result in any cumulatively considerable significant adverse <br />traffic impacts under cumulative plus Project conditions. (Draft SEIR, pp. 4.N-25 to 4.N-30; <br />Impact 4.N-6.) <br />14. Agricultural Resources <br />The Project would have no impacts on agricultural resources and would not <br />result in the loss of forest land or convert forest land to non-forest uses. (Draft SEIR, p. 6-9.) <br />15. Mineral Resources <br />The Project would have no impacts on mineral resources. (Draft SEIR, pp. 6-9 to <br />6-10.) <br />J. Less Than Significant Impacts With Mitigation Incorporated <br />The SEIR determined that the Project has potentially significant environmental <br />impacts in the areas discussed below and identified feasible mitigation measures to avoid or <br />substantially reduce some or all of the environmental impacts in these areas. Based on the <br />information and analyses set forth in the Draft and Final SEIRs, all but two of the Project <br />impacts will be avoided or substantially reduced to less than significant with identified feasible <br />mitigation measures incorporated into the Project. <br />The City Council agrees with the characterization in the SEIR with respect to all <br />impacts initially identified as "significant" or "potentially significant" that would be rendered less
The URL can be used to link to this page
Your browser does not support the video tag.