Laserfiche WebLink
A - 3 City of Pleasanton Operating Budget • FY 2023/24 - FY 2024/25 <br />APPENDIX A <br />Project Description FY 2023/24 <br />Budget <br />FY 2024/25 <br />Budget Totals <br /> Impact <br />to Annual <br />Operating <br />Budget <br /> Notes <br />Police Department <br />Training Facility <br />Repairs <br />This project includes the design and construction <br />of necessary repairs and upgrades to the City of <br />Pleasanton’s firearms range. The work will include <br />addressing the metallic build-up within the dirt berms <br />and the necessary upgrades to the range’s bullet trap <br />and equipment to be consistent with best practices. <br /> 2,700,000 - 2,700,000 90,000 Annual Replacement <br />Accruals (year 1) <br />Police Department <br />Secured Police <br />& Staff Vehicular <br />Parking <br />The project will construct secured parking around <br />the police department for the City's police vehicles <br />and police staff parking. The existing secured police <br />vehicle parking lot will be expanded into the general <br />parking of the Civic Center complex and improved <br />fencing and lighting will be constructed. <br /> - 200,000 200,000 NA <br /> Operating budget <br />will be calculated <br />once design is <br />complete. <br />Library Lighting <br />The project will replace the existing light fixtures and <br />lighting management system with LED lights and new <br />light control system with manual overrides. <br /> 900,000 - 900,000 87,000 <br />Annual Replacement <br />Accruals (year 1). The <br />total project cost is <br />$1.3M. <br />Asset Management <br />Plan <br />The Asset Management Plan will be an integrative <br />planning document, incorporating the City’s various <br />master plans for the overall management of all the <br />City’s infrastructure, and will aid in the update of <br />the 10-year Capital Improvement Plan and Repair <br />and Replacement Plan. The project will include <br />development of a City-wide Asset Management Plan <br />framework, establish objectives and performance <br />measures, develop an implementation plan for asset <br />management software, and conduct a general <br />condition assessment on the City’s 136 buildings. <br /> 750,000 250,000 1,000,000 70,000 <br />Annual Accruals <br />(year 1). The Master <br />Plan needs to be <br />updated every 5 <br />year. <br />Climate Action Plan <br />Implementation <br />This project will install the necessary city infrastructure <br />to implement electric vehicle (EV) fleet charging at <br />the City's Civic Center at 200 Old Bernal Avenue and <br />Operations Services Center at 3333 Busch Road, <br />working in partnership with East Bay Community <br />Energy. The project will upgrade the existing <br />infrastructure, including PG&E's electrical service. <br /> 1,000,000 - 1,000,000 100,000 Annual Replacement <br />Accruals (year 1) <br />S-14 Electrical <br />Improvements <br />This project will design and construct a new outdoor <br />electrical and control panel for Sewer Lift Station S-14. 700,000 - 700,000 35,000 Annual Replacement <br />Accruals (year 1) <br />Storm Water System <br />Management Plan <br />The Storm Water System Management Plan will be <br />an integrative planning document for the overall <br />management of the City’s storm water system. <br />The plan will establish objectives and performance <br />measures for collection and conveyance, capacity, <br />infrastructure renewal/upgrades, and operation <br />and maintenance, and will identify the needed <br />maintenance and replacement costs. The storm drain <br />system will be evaluated against these objectives and <br />performance measures to identify required areas of <br />improvement. <br /> - 500,000 500,000 50,000 <br /> Annual Accruals <br />(year 1). The Master <br />Plan needs to be <br />updated every 5 <br />year. <br />Sycamore Creek <br />Storm Drain <br />Improvements <br />This project will make improvements to the Sycamore <br />Creek storm drain system to reduce maintenance <br />needs and improve reliability of the system. The <br />project will make improvements to the headwall <br />structure, realign the 60-inch pipe at the intersection <br />of Sycamore Road and Sunol Boulevard, and repair <br />and remove sediment at the outlet of the system. <br /> 200,000 550,000 750,000 25,000 Annual Replacement <br />Accruals (year 1) <br />Storm Drain <br />Lift Station <br />Improvements <br />This project will assess and design the recommended <br />improvements to the City’s four existing storm drain <br />lift stations. The project will include a condition <br />assessment of each facility and design of the <br />recommended major maintenance, including the <br />building, electrical, and pumping systems. <br /> - 40,000 40,000 NA <br />Operating budget <br />impact will be <br />calculated once <br />design is complete. <br />Total Significant Non-recurring Capital Projects $20,985,512 $3,090,000 $24,075,512 $717,000