City of Pleasanton Operating Budget • FY 2023/24 - FY 2024/25A - 2 <br />Significant Non-recurring Capital Projects <br />The FY 2023/24 – 2026/27 CIP includes several significant non-recurring projects. A project is considered <br />significant if it has a measurable impact on the operating budget, or if the project rarely occurs. Once <br />completed, these projects will be added to the City’s Repair and Replacement Plan or Paving Plan <br />to be amortized over the life of the asset. Future budgets will include funding to cover the amortized <br />replacement cost that will fund future repair and replacement costs. The table below identifies the annual <br />amortization rate. City staff does not expect these projects to impact other areas of the operating budget <br />or expect these projects to result in additional savings or revenues. <br />Project Description FY 2023/24 <br />Budget <br />FY 2024/25 <br />Budget Totals <br /> Impact <br />to Annual <br />Operating <br />Budget <br /> Notes <br />West Las Positas <br />Boulevard <br />Multimodal <br />Reconstruction <br />Project <br />This project will provide long-term and interim <br />repairs to the ongoing roadway settlement on <br />West Las Positas Boulevard from I-680 to Santa Rita <br />Road. This will reconstruct or replace portions of the <br />roadway and sidewalk, including utility repairs, curb <br />and gutter, sidewalk and road section replacement. <br />This project also includes the construction of <br />pedestrian, bicycle and transit improvements to <br />bring the corridor up to an “all users and abilities” <br />design standards. <br />$5,450,000 $1,200,000 $6,650,000 NA <br /> Transportation <br />project with annual <br />maintenance is <br />budgeted through <br />CIP. <br />Hopyard Road & <br />Owens Drive <br />Intersection <br />Improvement <br />The project will make improvements to the south <br />and north legs of the Owens Drive and Hopyard <br />Road intersection and include protected bicycle <br />and pedestrian improvements. This project will <br />widen Hopyard Road by narrowing the median and <br />widening the northwest corner to add a southbound <br />right-turn lane from Hopyard Road onto westbound <br />Owens Drive. <br /> 2,320,000 - 2,320,000 NA <br /> Transportation <br />project with annual <br />maintenance is <br />budgeted through <br />CIP <br />Sunol Boulevard <br />Interchange <br />Improvements <br />This project will fund the design and construction <br />of the I-680 at Sunol Boulevard interchange <br />improvements. This includes a Project Study Report, <br />cost estimate, environmental documentation, and <br />the preparation of plans and specifications. <br /> 2,650,000 350,000 3,000,000 NA <br /> Transportation <br />project with annual <br />maintenance is <br />budgeted through <br />CIP. <br />Westbound <br />Bernal Avenue <br />at First Street/ <br />Sunol Boulevard <br />Intersection <br />Improvements <br />This project is intended to improve capacity of the <br />intersection and create a gateway to the Downtown. <br />The project will include a fully protected intersection <br />with dedicated pedestrian and bicycle facilities, while <br />adding a second westbound left-turn lane from <br />Bernal Avenue to southbound Sunol Boulevard. The <br />project will expand the east leg of the intersection <br />into the Pleasanton Unified School District property <br />and include improvements along Sunol Boulevard <br />to Mission Drive. The project will include new <br />traffic signals, bike lanes, updated irrigation and <br />landscaping. <br /> 600,000 - 600,000 NA <br /> Transportation <br />project with annual <br />maintenance is <br />budgeted through <br />CIP. <br />Pioneer Cemetery <br />Master Plan <br />Implementation <br />The Pioneer Cemetery Master Plan Implementation <br />will be utilized for maintenance and improvement <br />projects as identified in the 2014 Pioneer Cemetery <br />Master Plan or the updated plans. These projects <br />would include seasonal replacement of the plants <br />in the hanging flower baskets, small landscape <br />renovation projects, and other minor projects. <br /> 300,000 - 300,000 12,000 <br /> Annual <br />Replacement <br />Accruals (year 1) <br />Skatepark <br />This project involves the replacement and expansion <br />of the existing 8,000-square-foot skatepark at Ken <br />Mercer Sports Park. <br /> 3,115,512 - 3,115,512 128,000 <br /> Annual <br />Replacement <br />Accruals (year 1). The <br />total project cost is <br />$6.4M. <br />Sanitary Sewer <br />Management Plan <br />This project updates the Sewer System Management <br />Plan (SSMP) - an integrative planning document <br />for overall management of the City’s sewer system. <br />Elements of the plan include administration, <br />operations & maintenance, capital improvements, <br />resources, and financing. The plan is overarching and <br />references other more focused plans/studies where <br />required. This project will include an assessment of <br />sewer infrastructure and recommend short- and <br />long- term capital improvements. <br /> 300,000 - 300,000 120,000 <br />" <br />Annual Accruals <br />(year 1). The total <br />project cost is $0.6M. <br />The Master Plan <br />needs to be updated <br />every 5 year. "