My WebLink
|
Help
|
About
|
Sign Out
15 ATTACHMENT 1
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2023
>
051623
>
15 ATTACHMENT 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/10/2023 4:51:55 PM
Creation date
5/10/2023 3:54:52 PM
Metadata
Fields
Template:
CITY CLERK
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
272
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C - 3 City of Pleasanton Operating Budget • FY 2023/24 - FY 2024/25 <br />APPENDIX C <br />• All budget transfers within a fund require the approval of the City Manager or designee. <br />• Budget transfers required to hire additional permanent personnel require the City Council’s <br />approval. <br />• The City will have various expenditure controls in place to ensure the City does not over- <br />expend its budget including (1) position requisition must be budgeted and approved by the <br />City Manager, (2) Finance staff will review purchase and contract requests to ensure there are <br />adequate funds and (3) mid-year budget reviews to forecast expenses and revenues through <br />year-end to ensure the City ends the year with a balanced budget. <br />• The City will fully fund accrued unused vacation annually. <br />• The City will periodically update replacement and maintenance financing plans, and <br />incorporate them into the Budget. <br />E. FUND BALANCE <br />• The budget year estimated fund balance includes prior year actual fund balance plus <br />estimated revenues minus the expenditure budget. <br />• Long-term liabilities including Pension, OPEB and debt (bonds and loans) are excluded from <br />fund balance. <br />• The Workers Compensation Fund balances include claims payable (estimated value of all <br />claims the City has received that are still outstanding). <br />F. CAPITAL IMPROVEMENT POLICIES <br />• The City will construct all capital improvements in accordance with an adopted capital <br />improvement program. <br />• The City will develop a four-year plan for capital improvements to be updated at least bi- <br />annually. Future capital revenues and expenditures will be projected annually for a four-year <br />period based on changes in the community population, real estate development and/or <br />replacement of the infrastructure. <br />• The City will coordinate preparation of the Capital Improvement Budget with preparation of the <br />Operating Budget. Future operating costs associated with new capital improvements will be <br />projected and included in Operating Budget forecasts. <br />• The City will identify the estimated costs and potential funding sources for each proposed <br />capital project before it is submitted to Council for approval. <br />• The City will attempt to determine the least costly financing method for all new projects. <br />• The estimated cost of Capital replacement for enterprise funds such as water and sewer will <br />be updated at least every two years to ensure that rates and charges are covering the full cost <br />of operating these programs.
The URL can be used to link to this page
Your browser does not support the video tag.