Laserfiche WebLink
City of Pleasanton Operating Budget • FY 2023/24 - FY 2024/25C - 8 <br /> <br />2. Costs of items acquired or installed to replace damaged property. <br /> The actual hydrant, lamp post, sign or signpost, or other item acquired or installed should be charged <br />to the claim. This cost should be determined by the actual out-of-pocket cost if purchased for this <br />specific repair or the replacement cost value if taken out of storage. If the replacement is an upgrade <br />from the item which was damaged, the charge should only be for the cost of the comparable item <br />with two exceptions. First, if the only readily available item (or in an emergency, the only immediately <br />available item) differs from the replace item, the City will charge the full cost. (Example -- they no <br />longer make the old type, or the old type is not available on nights and weekends and we could not <br />wait.) Second, if a wooden signpost was damaged, but the City standard for a signpost is now to use <br />a metal signpost (or a larger wooden signpost), the City will charge for replacement at the current <br />standard. <br />3. Staff labor time. <br /> The City expends time handling the damage or theft. All of that time should be charged to <br />the offending party at the fully burdened hourly rate of those staff members who deal with the <br />problem(s). The types of time which might be incurred include: <br />a. Investigative Time <br /> This is time required to determine who is responsible for the damage or theft. This <br />could be incurred by a police officer, a member of the staff who observes the incident, <br />or a staff member asking questions to find out what happened. <br />b. Solution Definition Time <br /> This is time spent deciding the best thing to do to resolve the problem. It might include <br />time spent taking a vehicle to three repair shops to get bids, time spent determining <br />whether to sand-blast or paint over graffiti, etc. <br />c. Preparation Time <br /> This is the time spent acquiring the materials needed to effect the repair or <br />replacement. It could involve determining the specifications for the item, procurement <br />time (including centralized purchasing if applicable), or adjustment of equipment <br />centrally so that it can be used to effect the repair/replacement. <br />d. Repair/Replacement/Installation Time <br /> This is the time actually spent replacing the item or repairing it. This included the travel <br />time involved. <br />e. Participant Interaction Time <br /> This is the time spent handling the parties involved in the incident. <br />f. Accounting/Billing/Office Time <br /> This is the time spent determining the charges and preparing a bill. It would include <br />Finance Department time.