My WebLink
|
Help
|
About
|
Sign Out
05
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2023
>
062023
>
05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2023 3:38:17 PM
Creation date
6/14/2023 3:35:35 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
6/20/2023
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A <br /> BSK Associates - 2023 Schedule of Fees - City of Pleasanton <br /> PERSONIVEL RATES <br /> PROFESSIONAL STAFF 7ECHNICAI STAFF!North Prcvoibnd Woael <br /> Principal $ 274.15 Group i Special Inspector $ 194.63 <br /> Senior Professional $ 233,78 Group 2 Special Inspector $ 188.01 <br /> Project Professional 11 $ 195,78 Group 3 Engpineerin9 Technician $ 164.13 <br /> Project Professional I S 145.91 Group 4 TecMician $ 144.03 <br /> Staff Professional 11 S 120.77 Courier $ 64.33 <br /> Staff Professional I S 98,90 Administrative Assistant $ 76.50 <br /> Project Administrator $ 106.06 <br /> B4SIS OF CHARGES FOR FIELD TECHNICIAN SERVICES <br /> REIMRURSARLES Field Work from 0 to 4 hours SM 4 hours <br /> Mileage(Pornal to Portal) IRS Rafe Field Wort from 4 to 8 hours 8th R hours <br /> Per Dam(as required) 5 210oll Field Work over R hours/Saturdays &A toe and a half <br /> Bridge Toll Cost•15% Sundays,holidays and over 12 hours Bill double time <br /> Parka Fees Cast-15% Second/Special/Multi-Shaft Base Rate x 12-5% <br /> Subcrosult m Services Cost•15% Slow-up toe(no work performed) 80 2 hours <br /> Sampling or Cylinder Pickup,minirI charge SM 2 hours <br /> Project Setup(Protect) S 525.00 EQULPMENT <br /> Nuclear Gauge(Dour) S 67.00 <br /> ANALY56 5OFTWARf USAGE FEES <br /> Ultrasonic Weld Equipment(Day) $ 67.00 <br /> liNT(Project) 5 62.00 Torque Wrench(Day) S 6700 <br /> LPR!(Project) S 62.00 Proof Load Equipment(Day) 5 67.00 <br /> APik(Project) S 62.00 Rebar Locator/Pachometer S 122-00 <br /> SHAFT(Project) S 62-00 Hand Auger(Day) S 244.00 <br /> GROUP(Project) S 12108 Water Meter(Day) S 62.00 <br /> C6q IProlaa) S 62-00 Drilling Kit-Pant,stakes a"hath-(Project) S 3200. <br /> Lquety to(Project) 5 62.00 Drilling Supplies-Reuse of tubes/caps(Project) S 305.00 <br /> LiOT(►room) S 53.00 Manometer(Day) S 235.00 <br /> NO-UQ(Project) S 62.00 Double Rang NrBltrometer(Day) S 600.00 <br /> Slide(Protect) S 121.00 <br /> Settle3D(Project) S 121.00 Di/PRFVAMWI WAIF AOaeMIMiyRATION FFFC/MONTMI VI <br /> Arc61S(Protect) S 62.00 Certified Payroll/DIR Upoad S 300.00 <br /> EZ-FRISK(Pur Project Site/Site Class) 5 578.00 Nan-Performance Certified Payroll/DIR Upload 5 100.00 <br /> Subcmaacror Managemnet/Compwnce Forms S 100.00 <br /> Additional LCP Trader or Other Compliance Software S 200.00 <br /> Additional Speod Forms.as required S 150.00 <br /> SOILS <br /> AFobmre Density Corm CvlNomfo B vmg Ratio$CLM1 <br /> Standard Proctor,4-(ASTM/AASHTO) 5 282.00 CBR at 100%(AST1M D1883 or AASHTO T-180) 5 614.00 <br /> Modified Proctor,4-Mold IMIM/AASHTO) $ 282.00 CBR at 95%[ASTM DING or AASHTO T-13D) S 1,190.00 <br /> Modified Proctor,6-mold(ASTM D15S7) S 3OD.00 <br /> Ca1trNH Mmmm Wet Density(CT 216) S 257.00 Permeobi9fy Tem <br /> Check Pont 5 163.00 Rigid Wag Permmb*W(ASTM D2434) 5 338.00 <br /> Fledbh Wag PermeabiMy(ASTM D5054) 5 52700 <br /> PorOck Size Anall ss Remolded Flerwall Perm(ASTM D5084) 5 670.00 <br /> Save Analysis w/Wash(ASTM D422) S 205.00 <br /> Maus 9200 Wash,Sod(ASTM D1140) S 100.OD Soil eorrosivicy Tem <br /> Hydrometer Analysis(ASTM 0422) S 269.00 Minoan Resisti iiLy of Soils(R 643) 5 169.00 <br /> Double Hydrometer(ASTM D4221) S 375.00 PH S 79.00 <br /> Specific Grnrity of Sail(ASTM D854) S 192.00 Sohoa Sulfur.Chloride aro SuKide 5 156.00 <br /> Visual Cossdiation(ASTM D248M S 51-00 <br /> Sand Equeraant(ASTM D2419) 5 15100 Soil Crawler Tests <br /> %Organics in Sod(ASTM D2974) S 164-00 Freeze Thaw Abrasion(ASTM 056M S 751.00 <br /> Wetting-Drying Abrasion(ASTM D559) S 713.00 <br /> Afterberq Limit l5wril Tem Preparation of Freeze-Thaw or Wettiji-Drying Tests 5 902.00 <br /> Plasticity Index(ASTM D4318) S 263.00 Soil Cement Compression(ASTM D1633) S 289.00 <br /> Sh nkaBe lois of Sorb(ASTM D427) S 245.00 <br /> Expansion Index of Soils(UBC Ni 29) S 28100 Other <br /> Sand Density Calibration(ASTM D1566) S 112.00 <br /> Moisewe Density Test <br /> Tube Density S li IMconJntd Canpresson <br /> Moisture Content of Sods(ASTM D2216) S 51-00 Unconfined Compressor(ASTM D2166) S 151.00 <br /> "R-Value Drrfermination Shear Tests <br /> R-Value of Sail(CT 301) 5 477.00 Direct Shear,Undisturbed(ASTM D3080) S 263-00 <br /> R-Vake of Treated Materials ICT 301)) S 52700 Direct Shear,Remolded(ASTM D3080) 5 314.00 <br /> Tnoxa(Compression Testing QUOTE <br /> Consolidation Tem <br /> Consolidation(ASTM D2435) $ 502.00 <br /> Consolidation,Extra Polus(ASTM D2435) S 67.00 <br /> Collapse Potmtol of Sols(ASTM D2435) 5 245.00 <br /> Remolded Cmsolidoom(ASTM D2435) S 425.00 <br /> One-Damen Swell of Sod(ASTM D4546) 5 156.00 <br /> BSI(Fee Schedule 2022-2-MPW Bone 1 of 2 ASSOCIATES 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.