Laserfiche WebLink
BSK Associates - 2023 Schedule of Fees - City of Pleasanton <br /> LABORATORYMATERIALS <br /> AGGREGATES CONCRETE <br /> Sieve Analysrs Coarse or Fine(ASTM C136) 5 100.00 Cement Content Concrete(ASTM C1084) 5 453.00 <br /> Sieve Analysis w/Fineness Modulus S 107.00 Chemical Test(ASTM C150) QUOTE <br /> Minus 200 Wash,Aggregates(ASTM C317) S 100.00 Set Times Cement-Vicat Needle(ASTM C391) S 375-00 <br /> Specific Gravity/Absorption(ASTM C127) S 192-00 Specific Gravity of Hydrauic Cement(ASTM C191) 5 181.00 <br /> Specific Gravity/Absorption(ASTM C1281 S 192.00 Ureal Shrinkage Set of 3(ASTM C157) S 477.00 <br /> Organic Impurities ASTM C40) 5 100.00 Compression Test of Concrete-1(ASTM C39) S 41.00 <br /> %Lumps/Friable Particles(ASTM 0142) S 97.00 Compression Test of Concrete-4(ASTM C39) 5 163.00 <br /> %Flat and Elongated(ASTM D4791) 5 151-00 Compression Test of Care(ASTM C42) 5 7200 <br /> Fine Aggregate Angularity(AASHTO 304) S 97-00 Preparation of Specimens,Sawing S 82-00 <br /> Moisture Content(ASTM D2216) 5 51-00 Compressive Strength of Sfiotcrete Panel 5 382.00 <br /> Aggregate Wt.,pcf Compacted(ASTM C29) S 106-00 Proportion of Cement in Concrete(ASTM CBS) 5 419.00 <br /> Aggregate Wt.,pcf loose(ASTM C29) S 79-00 Flexural Test Per Beam(ASTM C78) S 107.00 <br /> Abrasion by LA Rattler,Small See(ASTM 0131) S 282.00 Splatng Tensile Strength of Concrete(ASTM 0196) 5 10700 <br /> Abrasion by LA Rattler,Large See(ASTM 0131) S 343.00 Unit Weight Lt Wt Concrete(ASTM C567) S 6700 <br /> Sodium Sulfate Soundness,Per Sieve(ASTM C86) S 131-00 -AZ-Test-Reinbrced Concrete Pipe-Lite Factor $ 93.00 <br /> Sodium Sulfate Soundness,Mm.Charge(ASTM CBS) S 419.00 9 Pt Core Measurements,Each(ASTM C374) 5 41.00 <br /> Sand Equivalent(ASTM D2419 OR CT 2174) S ISL00 Concrete Trial Batches QUOTE <br /> Durability Index ICT 229) S 300.00 Unit Weight i Abs Concrete(ASTM D642) S 151.00 <br /> Potential Reacri ty of Aggregates QUOTE Accelerated Curing of Concrete(ASTM 0684) 5 300.00 <br /> Cleanness Value of Aggregate(CT 227) S 216-00 Cylinder Molls(each) 5 B.Do <br /> Hydrometer(ASTM D422 OR CT 205-E) S 269.00 Storage of Concrete Minders for more than 45 Days S 69.00 <br /> %Crushed particles(CT 205) S 198-00 RH Probe 5 69-00 <br /> Lightweight Pieces(ASTM 123) S 263.00 Calcium Chloride rit S 46-00 <br /> Maung Water(pH,elecconductance,cMaide,sulfate) S 119.00 <br /> NOT MIX ASPHALT Contact Sod IDH,elec conductance.chloride,sukfatel S 143.00 <br /> JMf Mu Design,HVEEM 5 3,719-00 <br /> IMF Mu Design,Marshall S 4,407.00 MASONRY <br /> IMF Mu Design.Superpave/Caltrans 5 10.737.00 Concrete Masonry Units Testing(ASTM C90) <br /> IMF Verification-HMA-Superpave/Catrahs 5 6,222.00 Compression Test Pavers,Single S 9200. <br /> IMF Production Startup-Superpave I Civilians 5 5,789.00 Compression Test Compost CMU Pin. 5 19800 <br /> RAP Material Testing-Additional Fee 5 753.00 Specific Gravity and Una Weight S 138.00 <br /> Rubberued RHMA Material-Addtsonal Fee 5 1,737.00 Moisture Content S 64-00 <br /> Hamburg Wheel Tract(AASHTO T324) 5 3,155.00 Compression Test,Masonry Units(ASTM C1401 5 125.00 <br /> Gyratory Compaction(AASHTO T3121 S 401-00 Absorption/Moisture Content(ASTM CIAO) 5 125.00 <br /> Ac Content by Centrifuge(ASTM D2172) S 344.00 Linear Shrinkage(ASTM 0426) 5 483.00 <br /> AC Content-Ignmon(ASTM D6307/CT382/AASNTO T308) 5 269.00 Masonry Core Shear Test(Title 24) S 225.00 <br /> Superpave ignition Oven Correction(AASNTO 7308) S 625.00 Masonry Core Compression/Shear Test(Tale 24) S 22500 <br /> Moisture Content of Asphalt LCT 370) 5 79.00 Compression Test Bride,Each(ASTM 0671 5 93-00 <br /> Gradation/Extraction Aggregate(ASTM D5444) S 163.00 Absorption/Unit Wt of Brick(ASTM C67) 5 93.00 <br /> Filen Strapping S 107.00 Compression Test Grout(Set of 3 or 4) 5 144.00 <br /> Compaction/Preparation of HMA Briquette(CT 304) S 263-00 Compression Test Mortar(Set of 3 or 4) S 131.00 <br /> Stab4ometer Value ICT 366/AASHT0 T246) 5 211.00 <br /> AC Core Specific Gravity(ASTM D2726) 5 67.00 WELDING AND STRUCTURAL STEEL <br /> AC Core SmiTr Gravity-Paraffin Coated(AASHTO T275) 5 175.00 Weider QualrCsrotion Testing <br /> AC Max Density Rice Method(ASTM D2011) 5 300.00 Weider/Procure Welder Qualification Testing QUOTE <br /> CIR/FDR Compressive Strength Testing(prrcopmpacted 5 28900 Face Send of Seel 5 7200 <br /> specimen,includes conditioning)-CTM 371 <br /> Tensile Strength RAW(AASHTO T283) 5 1,316.00 Root Bend of Weld Coupon 5 72-00 <br /> Moisture Vapor Susceptibility ICT 307) 5 245.00 Side Berta of Weld Coupon 5 7200 <br /> AC Surface Abrasion(CT 360) S 601-00 Tensile Test of Steel Coupon 5 100.00 <br /> Index Retained Strength(ASTM D1074-D3075) S 538.00 Bend Test of Steel Coupon S 86.00 <br /> AC Hveem Maximum Density(CT 375) S 538-00 Machining Charges(Per Coupon) QUOTE <br /> Marshall Stability and Flow(ASTM D6927) S 300.00 8rinc0 Hardness of Steel(ASTM E 30) 5 11900 <br /> Calculated AC Maximum Density(CT 367) S 119.00 Rockwell Hardness of Steel(ASTM E181 5 119.00 <br /> Marshall Maximum Density,50 Blows(ASTM D6926) 5 350.00 Bolt Ulhmat Load S 159 OO <br /> Examination of AC Cores S 41.00 Bolt Hardness(set of 3) S 11900 <br /> Thickness Determination of AC Cores S 26-00 Nut Hardness(set of 3) S 119.00 <br /> AC Tensre-Strength Premixed ASTM D4867 5 777.00 Washer Hardness(set of 3) S 11900 <br /> AC Tensile-Strength Lab Mixed ASTM DU67 S 1,316-00 Proof Loading,boot or nut S 16900 <br /> REINFORCING STEEL <br /> Tensile 6 Bend of Reber,13-48 S 177-00 FIREPROOFING <br /> Tensile 6 Bend M Reber,89-all S 177.00 Cohesion/Adhesion Fireproofing Materials 5 151.00 <br /> Bend Test of Rebar 5 69.00 Dry Density Fireproofing IASTM E505) 5 113.00 <br /> Sieg and Tensile Rebar Couplers(CT 670) 5 258.00 <br /> Tension Test of Welded Wire Fabric QUOTE <br /> Bend Test of Welded Wire Fabric QUOTE <br /> Weld Shear Test,Welded Wire Fabric QUOTE <br /> PT Cable Tensile and Elongation(ASTM A4I6 or A421) 5 326-00 <br /> PT Cable Preparation QUOTE <br /> Above rates include act applicable fringe,overhead arta profit calculations-No additional percentages for overhead,profit_or any other costs related to Labor wool be charged.Rates <br /> are current for Fiscal Year 2023-24(71112023-6/3012024)-The City Witt consider annual adjustments based on CPI(Consumer Price Index.May of applicable years)and submitted <br /> prior to the end of the fiscal year for approval based on ENR Construction Index for San Francisco and Bay Area. <br /> Menage-IRS Standard Rate shall be used as adjusted by IRS guidetines.Exclusive of toff charges. <br /> Subcontractor Markup shalt not exceed 15% <br /> Expenses;Reimbursable expenses are in addition to the agreed hourly fees and include actual expenditures made by the consultant m the interest of the project.Eligible reimbursable <br /> expenses shaft be billed at cost with a 10 percent markup.Reimbursable expenses include such items as postage,reproduction,drawing plotting,printing,special materials.or <br /> equipment for project deliverable to the City.Consultant's printing and reprographics for internal uses are excluded. <br /> BSK Fee Schedule 2022-2-NPW Pape 2 of 2 <br /> ASSOCIATES <br />