My WebLink
|
Help
|
About
|
Sign Out
16
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2023
>
081523 SPECIAL
>
16
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/9/2023 2:47:36 PM
Creation date
8/9/2023 2:47:12 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
8/15/2023
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
\I MARK TOI#6—Sunol Boulevard Line F-7 Water Improvements <br /> City of Pleasanton <br /> a ■ THOMAS <br /> Task 3.3. 100% PS&E <br /> Mark Thomas will prepare a 100%plan set, specifications, and an estimate of probable construction cost based <br /> on City comments on the 50%plans and estimate. As indicated in the Project Understanding, the design is based <br /> off a conceptual alignment and tied to horizontal references. The depth of the pipe will be determined during <br /> construction by others. We will prepare a comments response matrix and resolve the City comments ahead of <br /> the Bid Documents phase. <br /> Task 3.4. Bid Documents <br /> Mark Thomas will make final updates to the bid documents based upon comments from the City on the 100% <br /> PS&E. We will prepare a comments response matrix and resolve the City comments ahead of bidding. <br /> TASK 3 DEL/VERA BLES <br /> • Conceptual Design Exhibit <br /> • 50%Plans and Estimate <br /> • 100% Plans, Specifications and Estimate <br /> • Bid Documents <br /> TASK 4. BID SUPPORT <br /> Task 4.1. Bid Support <br /> Mark Thomas will support the City in the bidding process by answering written requests for information (RFI's) <br /> and providing design clarification as required. Because the level of effort required for bid support cannot be <br /> accurately forecast, Mark Thomas will provide bid support services on a time and materials basis. Mark Thomas <br /> has provided a budget amount based upon historic trends. Should the level of effort budget be insufficient, <br /> additional budget authorization will be required. The anticipated budget does not include the design of any major <br /> features for design addenda in the basic Bid Support Services. The City will prepare all copies of PS&E for <br /> distribution to bidders. <br /> TASK 5. DESIGN SUPPORT DURING CONSTRUCTION <br /> Task 5.1. Design Support During Construction <br /> During the construction phase, Mark Thomas will work closely with the City appointed and qualified Resident <br /> Engineer(RE) in order minimize construction conflicts and to expedite project completion. Mark Thomas will <br /> prepare Contract Change Order(CCO) plans, respond to Request for Information (RFI) and review shop drawings, <br /> if necessary. Mark Thomas will assist the City with CCOs including the preparation of plan revisions as well as <br /> interpretation of the contract documents. Work performed beyond the budget for this task will be performed on <br /> a time and materials basis. <br />
The URL can be used to link to this page
Your browser does not support the video tag.