My WebLink
|
Help
|
About
|
Sign Out
16
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2023
>
081523 SPECIAL
>
16
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/9/2023 2:47:36 PM
Creation date
8/9/2023 2:47:12 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
8/15/2023
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
\I MARK TO#6—Sunol Boulevard Line F-7 Water Improvements <br /> a a THOMAS City of Pleasanton <br /> TASK 3. DESIGN <br /> Mark Thomas will design the 20-inch water pipeline using the partial design/build methodology per the City's <br /> request. A conceptual design will be prepared,followed by additional submittals that will include plans, <br /> specifications, and an estimate of probable construction cost. <br /> The following plan sheets are anticipated: <br /> Plan Sheet Description Estimat-• Sheets <br /> Title Sheet 1 <br /> Index,Abbreviations, Legend 1 <br /> General Notes/Key Map 1 <br /> Plan and Profile(scale 1"=40') 4 <br /> Construction Details 5 <br /> TOTAL: 12 <br /> Task 3.1. Conceptual Design <br /> Mark Thomas will prepare a conceptual design for the water pipeline. This design will be schematic, showing a <br /> plan view with dimensions to fixed objects such as the face of curb. The purpose of this design is to rapidly <br /> identify the basic location of the pipe for review by the City and for use in the first field walk. <br /> Existing utility information will be obtained from sources that may include the City and the various utility <br /> companies directly. Mark Thomas will request utility data and prepare a master utility file for use in the 50% <br /> design submittal. <br /> A preliminary determination of pipe material will be prepared. It is assumed that the pipe material will be either: <br /> • PVC(C900-16 specification), or <br /> • Ductile Iron Pipe <br /> A working meeting with City staff will follow this submittal to review the tie-in/connection work. <br /> Task 3.2. 50% Plans and Estimate <br /> Mark Thomas will prepare a 50%design plan set and an estimate of probable construction cost. Most plan sheets <br /> will be included at this stage, although the design and details will generally only be 50%complete. Plan sheets <br /> will be prepared using an aerial background image. An associated profile grid will be included stacked above the <br /> plan layout. The profile will not include the water pipe elevation, as this will be determined during construction. <br /> This profile grid will only contain the existing ground elevation from LIDAR data. Existing utility lines will be shown <br /> in the plan, and also shown as a crossing location (without depth) in the profile. <br /> A field walk meeting with City staff will follow this submittal to review the tie-in/connection work. <br />
The URL can be used to link to this page
Your browser does not support the video tag.