Laserfiche WebLink
0012126 Not Required, CAF Compressor <br /> <br />0802356 Foam Refill, Pump, Foam Pro, <br />Power-Fill <br />FOAM REFILL PUMP <br />A 12v pump will be permanently mounted in the pump compartment. A male quick disconnect <br />fitting will be provided on the Left Pump Panel and a pick-up wand with a 6' tube and mating <br />female fitting will be provided loose. <br />The control switch for the pump will be located on the pump panel adjacent to the quick <br />disconnect fitting. The pump will be plumbed to the foam tank allowing the user to refill the foam <br />tank from the ground. <br />0031896 Demonstration, Foam System, Dealer <br />Provided <br />0005447 Foam Cell, 30 Gallon, Not Reduce <br />Water <br />FOAM TANK <br />The foam tank will be an integral portion of the polypropylene water tank. The cell will have a <br />capacity of 30 gallons of foam with the intended use of Class A foam. The foam cell will not <br />reduce the capacity of the water tank. The foam cell will have a screen in the fill dome and a <br />breather in the lid. <br />0091036 Drain, 1.00" Foam Tank #1 FOAM TANK DRAIN <br />The foam tank drain will be a 1.00" drain valve located inside the pump compartment accessible <br />through a door on the right side pump panel. <br />0091079 Not Required, Foam Tank #2 <br /> <br />0091112 Not Required, Foam Tank #2 Drain <br /> <br />0746445 Approval Dwg, Pump Operator's <br />Panel, Includes Color And Label <br />Tags <br />The following drawing(s) will be provided for approval by the customer. The drawing(s) will be <br />made for up One (01) Truck apparatus and/or similar Pierce job number. <br />PUMP OPERATOR'S PANEL DRAWING <br />A detailed drawing to scale of the pump operator's panel will be provided for the customer to <br />review. The drawing will include all of the gauges, controls, switching, etc.., located on the pump <br />operator's panel. The customer will be allowed to make changes and/or mark-ups to this approval <br />drawing. The fire apparatus manufacturer will make revisions (If needed) to the drawing per the <br />customer changes and/or mark-ups as long as the changes are physically possible within a <br />specific product line. <br />The finalized and signed customer approved pump operator's panel drawing will become part of <br />the contract documents. <br />Due to the way drain(s), bleeder(s), operational/maintenance tag(s) and NFPA required warning <br />tag(s) are placed on pump panel(s), these items will NOT be shown on any pump panel approval <br />drawing(s). These item(s) will be placed on pump panel(s) at the fire apparatus manufacturer <br />discretion. <br />COLOR CODED TAGS <br />A detailed drawing/chart of the colors used on all of the inlet(s) and outlet(s) will be provided for <br />the customer to review. The customer will be allowed to make changes and/or mark-ups to this <br />approval drawing/chart. The fire apparatus manufacturer will make revisions (If needed) to the <br />drawing per the customer changes and/or mark-ups as long as the changes are physically <br />possible within a specific product line. <br />The finalized and signed customer approved drawing/chart of the colors will become part of the <br />contract documents. <br />SPECIAL TEXT/VERBIAGE TAGS <br />A detailed drawing/chart of the text/verbiage used on all of the inlet(s) and outlet(s) will be <br />provided for the customer to review. The customer will be allowed to make changes and/or mark- <br />ups to this approval drawing/chart. The fire apparatus manufacturer will make revisions (If <br />needed) to the drawing per the customer changes and/or mark-ups as long as the changes are <br />physically possible within a specific product line. <br />The finalized and signed customer approved drawing/chart of the text/verbiage will become part <br />of the contract documents. <br />0035570 Pump Panel Configuration, No Match <br />Required <br />PUMP PANEL CONFIGURATION <br />The pump panel configuration will be neat and orderly. <br />0005525 Material, Pump Panels, Side Control <br />Brushed Stainless <br />PUMP AND GAUGE PANEL <br />The pump and gauge panels will be constructed of stainless steel with a brushed finish. A <br />polished aluminum trim molding will be provided on both sides of the pump panel. <br />53717Bid #: