Laserfiche WebLink
Table 3-12:Operating Cost Allocation <br />Recycled <br />Recycled <br />Water Surcharge <br />1 Water <br />2 Labor 47% 19% 18%7% 9% 100% <br />3 Electricity 56% 22% 22% 1000/o <br />4 Other Expenses 53% 21% 21%5% 100% <br />5 Attrition Savings 56% 22% 22% 100% <br />6 <br />7 Water <br />8 Labor 2,831,842 $1,132,737 $1,118,215 $420,000 $565,583 $6,068,377 <br />9 Electricity 445,714 $178,286 $176,000 800,000 <br />10 Other Expenses 2,172,294 $868,918 $857,778 $197,000 4,095,990 <br />11 Attrition Savings 67,619) ($27,048) ($26,701) 121,368) <br />12 Total-Water 0 0 $5,382,232 $2,152,893 $2,125,292 $617,000 $565,583 $10,842,999 <br />13 <br />14 Total-O&M Expenses 0 0 $5,382,232 $2,152,893 $2,125,292 $617,000 $565,583 $10,842,999 <br />15 %O&M Allocation 0.00/ <br />0 0.0%49.6%19.91/ <br />0 19.6% 5.7%5.2%100.0% <br />16 %O&M Allocation Less Supply 0.00/ <br />0 0.0%49.6%19.91/ <br />0 19.6% 5.7%5.2%100.01/. <br />Table 3-13:Capital Cost Allocation <br />1 Capital Costs <br />2 Water Replacement 56%22%22% 100% <br />3 Water R&R 56%22%22% 100% <br />4 <br />5 Assets <br />6 Water Replacement 2,499,608 $999,843 $987,025 4,486,476 <br />7 Water R&R 308,253 $123,301 $121,720 553,274 <br />8 Total-Assets 0 0 $2,807,861 $1,123,144 $1,108,745 $0 0 $5,039,750 <br />9 %Capital Allocation 0.0% 0.0% 55.7% 22.3% 22.0% 0.0% 0.0% 100.00/0 <br />44 CITY OF PLEASANTON