My WebLink
|
Help
|
About
|
Sign Out
PACIFIC GAS AND ELECTRIC - INTERCONNECTION AGREEMENT NEM2V
City of Pleasanton
>
CITY CLERK
>
LONG TERM AGREEMENT
>
P
>
PACIFIC GAS AND ELECTRIC - INTERCONNECTION AGREEMENT NEM2V
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/21/2026 3:20:47 PM
Creation date
11/7/2023 4:08:44 PM
Metadata
Fields
Template:
LONG TERM AGREEMENTS
LONG TERM AGREEMENTS - DOCUMENT DATE
7/31/2025
LONG TERM AGREEMENTS - NAME
PACIFIC GAS & ELECTRIC
LONG TERM AGREEMENTS - TYPE
MISC AGMT
LONG TERM AGREEMENTS - RECORD SERIES
704-06 (Long Term Agreements)
LONG TERM AGREEMENTS - DESTRUCTION DATE
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INTERCONNECTION AGREEMENT FOR <br /> NET ENERGY METERING 2 (NEM2) <br /> OF A RENEWABLE ELECTRIC GENERATING FACILITY <br /> FPacific Gas and OF 1 ,000 KW OR LESS, EXCEPT NEM2 SOLAR OR WIND <br /> Electric Company' FACILITIES OF 30 KW OR LESS, AND VIRTUAL NET <br /> ENERGY METERING (NEM2V) OF A RENEWABLE <br /> ELECTRIC GENERATING FACILITY OF 1 ,000 KW OR <br /> LESS <br /> APPENDIX G <br /> Operating Requirements for Energy Storage Device(s) <br /> (when applicable) <br /> The following Operating Requirement(s) apply to the charging functions of the Generating Facility: <br /> ❑ Producer's storage device(s) will not consume power from Distribution Provider's Distribution <br /> System at any time. <br /> ❑ Producer's storage device(s) will not cause the Host Load to exceed its normal peak demand. <br /> Normal peak demand is defined as the highest amount of power required from the Distribution <br /> System by Producer's complete facilities without the influence or use of the energy storage <br /> device(s). <br /> ❑ To avoid upgrades or other technical mitigation items identified in the interconnection process, <br /> Producer has chosen the following Generating Facility operating constraint(s).- <br /> For <br /> onstraint(s):For the annual period between [Month/Day] and [Month/Day] <br /> And during the hours of <br /> The storage device(s)will consume no more than a total of_kW from the Distribution System. <br /> This operating constraint voids the need for the following specific mitigation scope: <br /> No other charging function limitation is required for this Generating Facility except the requirements <br /> above. Producer will be responsible for the costs of the corresponding upgrades or other technical <br /> mitigations if at any time the Producer elects to forego or violates the operating requirement. <br /> Consistent with current load service Rules, Distribution Provider is not required to reserve capacity for <br /> load. Producer is responsible to contact the utility for any modification to its equipment or change in <br /> operations that may result in increased load demand per Electric Rule 3.C. <br /> If any operating requirement is specified above, Distribution Provider reserves the right to ask for data <br /> at the 15-minute interval level at any time to verify that the operating requirement is being met. <br /> Automated Document,Preliminary Statement A Page 1 of 2 <br /> Form 79-1220-02,Appendix G <br /> Advice 6624-E <br /> June 2022 <br />
The URL can be used to link to this page
Your browser does not support the video tag.