Laserfiche WebLink
INTERCONNECTION AGREEMENT FOR <br /> NET ENERGY METERING 2 (NEM2) <br /> OF A RENEWABLE ELECTRIC GENERATING FACILITY <br /> PacificGasandOF 1 ,000 KW OR LESS, EXCEPT NEM2 SOLAR OR WIND <br /> Electric Company FACILITIES OF 30 KW OR LESS, AND VIRTUAL NET <br /> ENERGY METERING (NEM2V) OF A RENEWABLE <br /> ELECTRIC GENERATING FACILITY OF 1 ,000 KW OR <br /> LESS <br /> Distribution Provider will make such request via a written notice no more than once per calendar <br /> quarter. Producer must provide such data within 30 Calendar Days of the written request. <br /> If the Generating Facility fails to adhere to the operating requirements at any time, it will be <br /> disconnected immediately in accordance with Rule 21 Section D.9 and not reconnected until an <br /> approved mitigation (e.g., supervising controls) is in place as determined by Distribution Provider. <br /> Automated Document,Preliminary Statement A Page 2 of 2 <br /> Form 79-1220-02,Appendix G <br /> Advice 6624-E <br /> June 2022 <br />