Laserfiche WebLink
Page 3 of 4 <br />constructed walkway along the Foothill Road frontage of the Alviso Adobe park will be <br />maintained by the City as well as the surrounding landscape improvements. <br /> <br />The Sun Meadowlark Estates homeowner’s association will maintain the frontage landscaping <br />south of the cul-de-sac, which includes a stormwater treatment facility. The association will <br />also maintain a fire-break area within the adjoining open space that surrounds the rear yards, <br />as well as a wetlands area within Lot 2. <br /> <br />Acceptance of the constructed public improvements will add to the City’s inventory of <br />infrastructure requiring long-term maintenance. Specifically, the following public improvements <br />were added: <br /> <br />Description Quantity Unit Value (nearest thousand) <br />Roadway pavement 22,550 Square feet $105,000 <br />Street signs 2 Each $1,000 <br />Pavement markings 1 Lump sum $6,000 <br />Curb & gutter 1,447 Lineal feet $51,000 <br />Sidewalk 7,247 Square feet $58,000 <br />Driveways 8 Each $10,000 <br />Curb ramps 5 Each $15,000 <br />Storm drain pipe 2,007 Lineal feet $116,000 <br />Storm drain manholes 9 Each $35,000 <br />Storm drain curb inlets 6 Each $23,000 <br />Streetlights 5 Each $25,000 <br />Subtotal (General) $445,000 <br /> <br />Sewer manholes 4 Each $22,000 <br />Sewer pipe 471 Lineal feet $28,000 <br />Water pipe 489 Lineal feet $32,000 <br />Fire hydrants 2 Each $12,000 <br />Water meters 10 Each $45,000 <br />Subtotal (Enterprise) $139,000 <br /> <br />Total $584,000 <br /> <br />EQUITY AND SUSTAINABILITY <br />Not applicable, as this item is an administrative matter of City business. <br /> <br />OUTREACH <br />Prior to the approval of this subdivision, the development application was subject to public <br />hearings with the Planning Commission and the City Council. <br /> <br />Neighborhood interest in the subdivision became pronounced when funding from the <br />subdivider for a public trail within the open space parcel was accepted by the City Council on <br />March 3, 2020. The City Council subsequently allocated the funding to CIP No. 22797, a City <br />project to construct the trail. The trail was contemplated as part of the City’s Trails Master Plan <br />update in 2017. On May 17, 2022, the trail construction contract was reconsidered by the City <br />Council after receiving input from residents within the surrounding neighborhoods. The City <br />Page 212 of 270