My WebLink
|
Help
|
About
|
Sign Out
CITY COUNCIL AGENDA PACKET
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2023
>
121923 REGULAR
>
CITY COUNCIL AGENDA PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2023 6:21:19 PM
Creation date
12/18/2023 6:19:26 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
12/19/2023
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
270
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 1 of 3 <br />Item #17 <br /> CITY COUNCIL AGENDA REPORT <br /> <br />December 19, 2023 <br />Public Works - Operations Division <br /> <br />TITLE: CONTINUED FROM DECEMBER 5, 2023 - APPROVE FIRST AMENDMENTS TO <br />THE AS-NEEDED MAINTENANCE AND TRADE SERVICES AGREEMENTS BY <br />INCREASING THE TOTAL NOT-TO-EXCEED AMOUNTS TO $1,200,000 FOR <br />PIPE & PLANT SOLUTIONS INC. AND TO $750,000 FOR PRESIDIO SYSTEMS, <br />INC. FOR UTILITIES-SEWER/STORM FLUSHING AND CLOSED-CIRCUIT <br />TELEVISION (CCTV) SERVICES <br /> <br />SUMMARY <br />The Public Works Department is responsible for the operations and maintenance of the City’s <br />sewer and storm systems, which require cleaning and inspection to ensure proper operation. A <br />Request for Bids for CCTV cleaning and inspection services was distributed on August 4, <br />2021. Three contractors were selected to provide as-needed sewer or stormwater CCTV and <br />inspection services for planned and emergency work and to assist other City departments on <br />projects. Due to the storm events in late 2022 and 2023, the City relied heavily on these <br />contractors to assist with storm cleanup. Additionally, Pipe & Plant Solutions, Inc. has been <br />helping to assess the City’s sewer infrastructure in preparation for the updated 2024 Sewer <br />System Management Plan and long-term CIP project projections. Staff is requesting <br />amendments to the as-needed agreements with Pipe & Plant Solutions, Inc. and Presidio <br />Systems, Inc. to provide supplemental flushing and project-specific Closed-Circuit Television <br />(CCTV) services for the sewer and storm lines. <br /> <br />RECOMMENDATION <br />1. Approve and authorize the City Manager to execute an amendment to the as-needed <br />maintenance and trade services agreement with Pipe & Plant Solutions, Inc. to increase <br />the not-to-exceed amount by $700,000 for sewer CCTV service to revise the total not- <br />to-exceed agreement limit from $500,000 to $1,200,000 for FY 2023/24. <br />2. Approve and authorize the City Manager to execute the amendment to the as-needed <br />maintenance and trade services agreement with Presidio Systems, Inc. to increase the <br />not-to-exceed amount by $250,000 for sewer and storm cleaning services to revise the <br />total not-to-exceed agreement limit from $500,000 to $750,000 for FY 2023/24. <br /> <br /> <br />BACKGROUND <br />The Public Works Department is responsible for the operations and maintenance of the City’s <br />sewer and storm systems, which include 245 miles of sewer pipe, 6,032 sewer maintenance <br />holes, 195 miles of storm pipe, 4,222 storm maintenance holes, and 8,226 storm inlets that <br />require cleaning and inspection to ensure proper operation. All pipeline inspected is to be rated <br />per the National Steel and Shipbuilding Company (NASSCO) Pipeline Assessment <br />Certification Program (PACP). All maintenance holes inspected are to be rated per the <br />NASSCO Manhole Assessment Certification Program (MACP), which is the industry standard <br />Page 225 of 270
The URL can be used to link to this page
Your browser does not support the video tag.