My WebLink
|
Help
|
About
|
Sign Out
AGENDA PACKET
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2024
>
020624 REGULAR
>
AGENDA PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2024 9:38:50 AM
Creation date
2/6/2024 9:33:52 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
2/6/2024
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
554
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 3 of 3 <br />$265,217, one change order for $6,900, and a balancing change order for a deduction of <br />$53,500. Design services provided by Dudek under a professional services agreement totaled <br />$142,603, including $45,810 for the initial environmental design services, and an additional <br />$96,793 for trail design services, additional environmental and trail design services beyond <br />that previously scoped, and construction support services. A portion of Dudek’s agreement <br />was utilized for Santos Ranch stormwater repairs billed to that project, leaving $24,080 in the <br />agreement. The total available funding for this project was $489,026. The project expenditures, <br />including environmental review, design, construction, and other miscellaneous expenses, <br />totaled $368,160, leaving a balance of $120,866. Staff recommends returning the remaining <br />balance to General Trail Improvements and Development, CIP No. 01737 (Fund 222), as <br />outlined in Attachment 1. <br /> <br />The trail adds 0.7 miles to the roughly 50 miles of City-maintained trails. The maintenance cost <br />of the additional trail is expected to primarily be offset by an “adopt-a-trail” program that staff is <br />developing to maintain this mountain bike trail. However, staff time will be required to create <br />and manage the program, coordinate with volunteers, and provide maintenance assistance as <br />necessary. <br /> <br />All the work and project close-out documentation has been completed to the satisfaction of the <br />Interim Director of Public Works. Staff recommends the City Council accept the project as <br />complete. <br /> <br />Prepared by: Submitted by: Approved by: <br /> <br />Matthew Gruber, Landscape <br />Architect <br />Norm Dorais, Interim Director of Public <br />Works <br /> <br />Gerry Beaudin, City <br />Manager <br /> <br />Attachments: <br />1. Financial Expenditure Summary <br /> <br />Page 41 of 554
The URL can be used to link to this page
Your browser does not support the video tag.