Laserfiche WebLink
Tri-Valley Local Hazard Mitigation Plan; Volume 2—Planning Partner Annexes <br />x <br />Planning Partner Expectations <br />The planning team developed the following list of planning partner expectations, which were confirmed by <br />participating planning partners (see Appendix A for details): <br />• Complete administrative tasks: <br />➢ Planning partner collaboration agreement <br />➢ Designate points of contact. <br />➢ Approve the steering committee. <br />• Participate, as able, in additional opportunities: <br />➢ Attend steering committee meetings. <br />➢ Attend or host public meetings or open houses. <br />➢ Participate in and advertise the public review and comment period prior to adoption. <br />• Support the steering committee. <br />• Support the public involvement strategy. <br />• Complete the jurisdictional annex template: <br />➢ Attend the mandatory workshop. <br />➢ Perform a capability assessment. <br />➢ Review the risk assessment. <br />➢ Review area-wide mitigation recommendations. <br />➢ Develop a mitigation action plan. <br />• Adopt the plan. <br />By adopting this plan, each planning partner also agrees to the plan implementation and maintenance protocol <br />established in Volume 1. Failure to meet these criteria may result in a partner being dropped from the partnership <br />by the Steering Committee, and thus losing eligibility under the scope of this plan. <br />ANNEX-PREPARATION PROCESS <br />Templates <br />Templates were created to help the Planning Partners prepare their jurisdiction-specific annexes. Since special <br />purpose districts operate differently from incorporated municipalities, separate templates were created for the two <br />types of jurisdictions. The templates were created so that all criteria of Section 201.6 of 44 CFR would be met, <br />based on the partners’ capabilities and mode of operation. Templates available for the planning partners’ use were <br />specific as to whether the partner’s annex is an update to a previous hazard mitigation plan or a first-time hazard <br />mitigation plan. The templates were set up to lead each partner through a series of steps that would generate the <br />DMA-required elements that are specific for each partner. Detailed instructions on the completion of these <br />templates, including key definitions of required jurisdiction-specific components, were provided to all <br />participating planning partners. Reviewers of this plan seeking to “crosswalk” plan content to the Section 201.6 <br />44 CFR requirements are encouraged to review these instructions in conjunction with the content of this volume. <br />The templates and their instructions can be found in Appendix B to this volume. <br />Jurisdictional annexes were completed in three phases. Phase 1 was initiated in June 2022 and Phase 3 concluded <br />in December 2022. At the Phase 3 Workshop, the planning team reviewed instructions for completing the Phase 3 <br />Page 103 of 228