Laserfiche WebLink
3. City of Pleasanton <br /> 3-13 <br />Other Noted Vulnerabilities <br />No additional jurisdiction-specific issues have been identified based on a review of the results of the risk <br />assessment, public involvement strategy, and other available resources. <br />3.8 STATUS OF PREVIOUS PLAN ACTIONS <br />Table 3-13 summarizes the actions that were recommended in the previous version of the hazard mitigation plan <br />and their implementation status at the time this update was prepared. <br />Table 3-13. Status of Previous Plan Actions <br />Action Item from Previous Plan Status of Action <br />New <br />Action # <br />Action P-1—Where appropriate, support retrofitting or relocation of structures in high <br />hazard areas, prioritizing structures that have experienced repetitive losses. <br />Carried over to updated plan PLE-1 <br />Comment: This is an ongoing effort. <br />Action P-2—Integrate the hazard mitigation plan into other plans, ordinances and <br />programs that dictate land use decisions in the community, including the City’s General <br />Plan. <br />Carried over to updated plan PLE-2 <br />Comment: An update to the Safety Element of the General Plan will be completed upon adoption of the updated Hazard Mitigation Plan. <br />Action P-3—Actively participate in the plan maintenance protocols outlined in Volume 1 <br />of this hazard mitigation plan. <br />Carried over to updated plan PLE-3 <br />Comment: This is an ongoing effort. <br />Action P-4—Continue to maintain good standing and compliance under the NFIP through <br />implementation of floodplain management programs that, at a minimum, meet the NFIP <br />requirements: <br />• Enforce the flood damage prevention ordinance. <br />• Participate in floodplain identification and mapping updates. <br />• Provide public assistance/information on floodplain requirements and impacts. <br />Carried over to updated plan PLE-4 <br />Comment: This is an ongoing effort. <br />Action P-5—Identify and pursue strategies to increase adaptive capacity to climate <br />change including but not limited to the following: update and implementation of the <br />Climate Action Plan and update the General Plan to address recent legislation and <br />establish policies related to climate change adaptability. <br />Carried over to updated plan PLE-5 <br />Comment: The City adopted an update to its Climate Action Plan in February 2022 (CAP 2.0) and will implement the CAP on an ongoing <br />basis. <br />Action P-6—Tie public education on defensible space and a comprehensive defensible <br />space ordinance to a field program of enforcement. <br />Carried over to updated plan PLE-7 <br />Comment: This is an ongoing effort. <br />Action P-7—Prohibit construction of habitable structures within at least 50 feet of an <br />identified active fault trace where the fault has been specifically located in site-specific <br />geologic studies. <br />Carried over to updated plan PLE-8 <br />Comment: The City has and will continue to prohibit construction of habitable structures within at least 50 feet of an active fault. <br />Page 121 of 228