Laserfiche WebLink
Tri-Valley Local Hazard Mitigation Plan; Volume 2—Planning Partner Annexes <br />3-14 <br />Action Item from Previous Plan Status of Action <br />New <br />Action # <br />Action P-8—Prohibit new development of sites with structures intended for human <br />occupancy in any landslide-prone areas unless the landslide risk can be eliminated. <br />Permit development in landslide prone areas only when sites can be shown to be stable <br />during adverse conditions such as saturated soils, ground shaking, and during grading <br />of the site for roads, installation of infrastructure, and creation of building pads. <br />Engineering studies shall demonstrate that structures in landslide prone areas would <br />sustain no more damage due to slope instabilities than damage sustained by a similar <br />building in the Pleasanton Planning Area constructed to current CBC standards and <br />located on soils with a low susceptibility to failure when exposed to moderate ground <br />shaking. <br />Carried over to updated plan PLE-9 <br />Comment: The City has and will continue to prohibit new development of sites with structures in landslide-prone areas unless the <br />landslide risk can be eliminated. <br />Action P-9—Require fire mitigation measures in new and existing developments that <br />reduce the fire threat to the structure and occupants. Require development outside the <br />five-minute travel time and in Special Fire Protection Areas to provide effective fire <br />prevention measures. <br />Carried over to updated plan PLE-10 <br />Comment: The City has and will continue to require fire mitigation in new and existing developments that reduce the fire threat to the <br />structure and occupants. <br />Action P-10—Continue to conduct public meetings and issue press releases regarding <br />Del Valle Dam evacuation. <br />Removed; no longer feasible <br />Comment: Hazard information outreach will be done for all natural hazards. It is not reasonable for the city to only focus on the dam <br />inundation hazard. A new action has been included for community education and outreach for natural hazards. <br />Action P-11—Encourage replacing aboveground electric and phone wires and other <br />structures with underground facilities and use the planning-approval process to ensure <br />that, on a case-by-case basis, all new phone and electrical lines are installed <br />underground. <br />Carried over to updated plan PLE-13 <br />Comment: The City has and will continue to encourage replacement of aboveground electric and phone wires with underground facilities. <br />3.9 HAZARD MITIGATION ACTION PLAN <br />Table 3-14 lists the actions that make up the hazard mitigation action plan for this jurisdiction. Table 3-15 <br />identifies the priority for each action. Table 3-16 summarizes the mitigation actions by hazard of concern and <br />mitigation type. <br />Table 3-14. Hazard Mitigation Action Plan Matrix <br />Benefits New <br />or Existing <br />Assets Objectives Met Lead Agency Support Agency <br />Estimated <br />Cost <br />Sources of <br />Funding Timelinea <br />Action PLE-1—Where appropriate, support retrofitting, purchase or relocation of structures located in hazard areas, prioritizing those that <br />have experienced repetitive losses and/or are located in high- or medium-risk hazard areas. <br />Hazards Mitigated: Dam Failure, Earthquake, Flood, Landslide, Severe Weather, Wildfire <br />Existing 4, 5, 6, 8, 10, 12 City of Pleasanton Community <br />Development Department, <br />Engineering Department <br />Livermore- <br />Pleasanton Fire <br />Department <br />High <br /> <br />HMGP, BRIC, FMA Short-term <br />Page 122 of 228