My WebLink
|
Help
|
About
|
Sign Out
AGENDA PACKET
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2024
>
022024
>
AGENDA PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2024 11:04:13 PM
Creation date
2/13/2024 10:49:25 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
2/20/2024
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
228
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 2 of 4 <br />meet new ADA standards. Recent ADA laws (released in late 2023) require more ADA ramps <br />to be replaced than anticipated, as the new laws now require ADA ramps to be directional with <br />the crosswalks or the truncated ADA domes to expand across the crosswalks. This requires <br />replacing all ADA ramps where only one ramp currently services both crosswalks. <br /> <br />The proposed concrete work is carefully coordinated to occur before the Annual Street <br />Resurfacing Project, which is scheduled for construction in summer 2023. Street resurfacing, <br />by law, triggers the requirement to address any ADA deficiencies, which this project does in <br />preparation for the street paving work. See Attachment 1 for the general project locations of <br />the planned work. <br /> <br />Consultant/Specialty Services <br />Several sections of curb and gutter, sidewalk, and ADA ramps, are impacted by the roots of <br />existing trees. After the concrete is removed in these locations, the City’s on-call consultant, <br />West Coast Arborists, Inc. (WCA), assesses the tree roots to determine whether root pruning <br />is feasible or if the root pruning necessary is so extensive that it would compromise the tree. <br />WCA will present its recommendation to City staff and then perform the pruning or removal as <br />directed by staff. The goal is to keep the trees, with removal as a last resort. Sometimes <br />removal is unavoidable; for example, if it is determined that the root pruning needed to reinstall <br />the concrete is too extensive and will compromise the tree’s stability, the tree will be removed. <br />If a tree must be removed, another may be planted, depending on the location. <br /> <br />During the implementation of the project, and depending on the encountered soil conditions, <br />one of the City’s on-call geotechnical firms may be utilized for soil/materials testing to ensure <br />that improvements are constructed on a stable sub-base. <br /> <br />The current ADA guidelines require pedestrian push buttons to be updated to current <br />standards where ADA ramps or refuge/passageway islands are being replaced. One of the <br />City’s on-call traffic maintenance providers will perform the pedestrian push button <br />improvements. <br /> <br />Bids <br />Sealed bids for this project were opened on January 24, 2024. A total of 10 bids were <br />received, with CF Contracting, Inc. (CF) of San Francisco, California - the apparent low bidder <br />- requesting to withdraw its bid due to a clerical error. Staff reviewed CF’s request, which <br />satisfied the California Public Contract Code 5100 requirements for withdrawing its bid. The <br />remaining bids range from $720,618 to $1,874,052, compared with the Engineer’s Estimate of <br />$870,000 (see Attachment 2). The responsible lowest bid was received from Villalobos & <br />Associates, Inc., of Campbell, California, in the amount of $720,618, approximately 17 percent <br />lower than the Engineer’s Estimate. The past work performed by Villalobos & Associates, Inc. <br />was verified to be satisfactory, and staff recommends awarding the construction contract to <br />Villalobos & Associates, Inc. <br /> <br />Schedule <br />The work will be completed before the start of the annual resurfacing program, which is <br />anticipated to start construction in June 2024. <br /> <br />The proposed schedule for the project is: <br />Approval of Plans and Specifications/Award of Contract February 20, 2024 <br />Page 181 of 228
The URL can be used to link to this page
Your browser does not support the video tag.