<br />Item #Item Total Item Total Item Total Item Total Unit Price Item Total
<br />1 $161,500.00 $100,168.00 $152,000.00 $247,000.00 $16,500.00 $313,500.00
<br />2 $110,000.00 $121,470.80 $90,200.00 $159,500.00 $17,700.00 $194,700.00
<br />3 $47,500.00 $53,100.75 $70,000.00 $70,500.00 $19,500.00 $97,500.00
<br />4 $57,000.00 $174,387.84 $87,000.00 $84,600.00 $42,500.00 $255,000.00
<br />5 $40,000.00 $29,157.53 $27,000.00 $13,000.00 $49,000.00 $49,000.00
<br />6 $30,000.00 $24,424.49 $15,500.00 $8,000.00 $27,600.00 $27,600.00
<br />7 $7,500.00 $8,011.25 $9,500.00 $8,000.00 $13,000.00 $13,000.00
<br />8 $15,000.00 $15,396.41 $16,000.00 $12,000.00 $25,200.00 $25,200.00
<br />9 $5,000.00 $4,471.79 $11,100.00 $12,000.00 $13,800.00 $13,800.00
<br />10 $105,000.00 $210,000.00 $182,000.00 $182,000.00 $170.00 $238,000.00
<br />11 $201,300.00 $178,029.72 $201,300.00 $402,600.00 $46.00 $370,392.00
<br />12 $14,125.00 $42,375.00 $20,340.00 $33,900.00 $66.00 $37,290.00
<br />13 $3,000.00 $1,500.00 $1,200.00 $1,600.00 $2,300.00 $2,300.00
<br />14 $1,500.00 $800.00 $1,100.00 $500.00 $1,470.00 $1,470.00
<br />15 $35,000.00 $53,408.00 $25,650.00 $8,000.00 $46,600.00 $46,600.00
<br />16 $100,000.00 $10,000.00 $165,000.00 $0.00 $175,000.00 $175,000.00
<br />17 $0.00 $7,607.08 $12,200.00 $145,907.00 $13,700.00 $13,700.00
<br />$933,425.00 $1,034,308.66 $1,087,090.00 $1,389,107.00 $1,874,052.00
<br />Corrected Bid Amount
<br />Annual Curb & Gutter Removal/Replacement, CIP 24509
<br />Bid Opening: 2:00PM, 01/24/2024 Engineer's Estimate
<br />Franco Engineering, Inc.
<br />1120 Ninth Ave 525 Jacoby Street 550 Greenville Road 715 Comstrock St
<br />Tracy, CA 95304
<br />JJR Construction, Inc. Ghilotti Bros, Inc. FBD Vanguard Construction
<br />Granite Construction
<br />Company
<br />8657 Waterwell Way
<br />Attachment 2
<br />Bid Items
<br />US US US US
<br />Bidder Status: Valid
<br />San Mateo, CA 94402 San Rafael, CA 94901 Livermore, CA 94550 Santa Clara, CA 95054
<br />US
<br />Bidder Status: Valid Bidder Status: Valid Bidder Status: Valid Bidder Status: Valid
<br />Unit Price
<br />Remove and Replace (R/R) Case “___” (all
<br />cases) ADA Ramp 19 EACH $6,000 $114,000
<br />Unit Price Unit Price Unit Price
<br />Item Description Quantity Unit of
<br />Measure Unit Price Item Total
<br />$8500.00 $5272.00 $8000.00 $13000.00
<br />Remove and Replace (R/R) Case “___” (all
<br />cases) Oversize (OS) ADA Ramp 11 EACH $7,000 $77,000 $14500.00
<br />Remove and Replace (R/R) Cases “___” (all
<br />cases) with Blended Transition ADA Ramp 5 EACH $8,700 $43,500
<br />$10000.00 $11042.80 $8200.00
<br />$9,500.00 $10,620.15 $14,000.00 $14,100.00
<br />Remove and Replace (R/R) Cases “___” (all
<br />cases) with Blended Transition ADA Ramp
<br />with Island
<br />6 EACH $17,500 $105,000 $14,100.00
<br />Modify (3) existing Refuge/Passageway
<br />Islands at Hopyard/Stoneridge Intersection 1 LS $24,000 $24,000
<br />$9,500.00 $29,064.64 $14,500.00
<br />$40,000.00 $29,157.53 $27,000.00 $13,000.00
<br />Modify (1) existing Refuge/Passageway
<br />Island at Hopyard/Inglewood Intersection 1 LS $8,700 $8,700 $8,000.00
<br />Modify (1) existing Refuge/Passageway
<br />Island at Hopyard/W. Las Positas
<br />Intersection
<br />1 LS $4,200 $4,200
<br />$30,000.00 $24,424.49 $15,500.00
<br />$7,500.00 $8,011.25 $9,500.00 $8,000.00
<br />Modify (2) existing Refuge/Passageway
<br />Islands at Hopyard/Parkside Intersection 1 LS $8,500 $8,500 $12,000.00
<br />Modify (2) existing Refuge/Passageway
<br />Islands at Hopyard/Valley Intersection 1 LS $25,000 $25,000
<br />$15,000.00 $15,396.41 $16,000.00
<br />$5000.00 $4471.79 $11100.00 $12000.00
<br />Remove and Replace Curb and Gutter (C/G)
<br />Regardless of Type 1400 LF $78 $109,200 $130.00
<br />Remove and Replace (R/R) Sidewalk 8052 SF $24 $193,248
<br />$75.00 $150.00 $130.00
<br />$25.00 $22.11 $25.00 $50.00
<br />Remove and Replace (R/R) Driveway Type
<br />“C”565 SF $36 $20,340 $60.00
<br />Grind Lip and Install ADA Domes 1 EACH $1,000 $1,000
<br />$25.00 $75.00 $36.00
<br />$3000.00 $1500.00 $1200.00 $1600.00
<br />Install ADA Domes 1 EACH $850 $850 $500.00
<br />Valley Avenue and Via Del Los Milagros
<br />Valley Gutter Improvements per drawing A3-
<br />1
<br />1 LS $24,000 $24,000
<br />$1500.00 $800.00 $1100.00
<br />$35000.00 $53408.00 $25650.00 $8000.00
<br />Traffic Control 1 LS $100,000 $100,000 $0.00
<br />Modify (1) existing Refuge/Passageway
<br />Islands at Santa Rita Rd/W. Las Positas Blvd. 1 LS $11,462 $11,462
<br />$100000.00 $10000.00 $165000.00
<br />$0.00 $7607.08 $12200.00 $145907.00
<br />Total Bid Amount $ 870,000