My WebLink
|
Help
|
About
|
Sign Out
AGENDA PACKET
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2024
>
022024
>
AGENDA PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2024 11:04:13 PM
Creation date
2/13/2024 10:49:25 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
2/20/2024
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
228
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATTACHMENT 3 <br />Project Funding to Date Amount Totals <br />2023-24 CIP Allocation (Fund 160 - Gas Tax)$650,000 <br />TOTAL FUNDING TO DATE <br />Anticipated Project Expenditures <br />Advertising $751 <br />Villalobos & Associates, Inc. - Construction Contract 720,618 <br />Villalobos & Associates, Inc. - Project Contingency (Approximately 10%)72,000 <br />Pedestrian Push Button Installations/Modifications 100,000 <br />West Coast Arborists, Inc. - Tree Removal 10,000 <br />Material Testing Services 5,000 <br />TOTAL ANTICIPATED PROJECT EXPENDITURES <br />Funding Balance/ (Shortfall) <br />Current Balance/ (Shortfall)(258,369) <br />Funding to Cover Shortfall <br />Transfer from CIP No. 24505, Annual Sidewalk & Intersect. Ramp Installations $200,000 <br />Transfer from CIP No. 24512, Annual Sidewalk Maintenance 58,369 <br />Total Transfer of Funding to Cover Shortfall $258,369 <br />$908,369 <br />$650,000 <br />ANNUAL CURB & GUTTER REPLACEMENTS FOR STREET RESURFACING <br />CIP NO. 24509 <br />02/20/24 <br />Page 187 of 228
The URL can be used to link to this page
Your browser does not support the video tag.