My WebLink
|
Help
|
About
|
Sign Out
AGENDA PACKET
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2024
>
022024
>
AGENDA PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2024 11:04:13 PM
Creation date
2/13/2024 10:49:25 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
2/20/2024
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
228
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 3 of 3 <br />FISCAL IMPACT <br />Total available funding for this project was $200,000, as outlined in Attachment 1. The <br />expenditures total $159,719, and include advertising, electrical, and surveying services from <br />the City’s on-call consultants, as well as material and construction costs, leaving a balance of <br />$40,281. Staff recommends the project balance of $40,281 be returned to the Miscellaneous <br />CIP - General Fund (Fund 201). <br /> <br />All work and project close-out documentation has been completed to the satisfaction of the <br />Acting Director of Public Works. Staff recommends the City Council accept the project as <br />complete. <br /> <br />Prepared by: Submitted by: Approved by: <br /> <br />Huy Ho, Associate Engineer Adam Nelkie, Acting Director of Public <br />Works <br /> <br />Gerry Beaudin, City <br />Manager <br /> <br />Attachments: <br />1. Funding and Expenditure Summary <br /> <br />Page 190 of 228
The URL can be used to link to this page
Your browser does not support the video tag.