My WebLink
|
Help
|
About
|
Sign Out
AGENDA PACKET
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2024
>
022024
>
AGENDA PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2024 11:04:13 PM
Creation date
2/13/2024 10:49:25 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
2/20/2024
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
228
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 2 of 3 <br />parking. <br /> <br />In May 2022, UPR contacted the City about leasing the eastern 30 feet of UPR’s parcel, which <br />is the western half of the St Mary Street parking lot. On July 19, 2022, the City Council <br />approved a lease agreement with Union Pacific Railroad that allows for the continued use of <br />the western half of the parking lot and for the area to be improved. <br /> <br />On December 20, 2022, the City Council awarded the construction contract to the lowest <br />responsible bidder, JJ Construction & Design, Inc., in the amount of $118,000 and authorized <br />the Director of Engineering to approve change orders up to the project contingency amount of <br />$19,495 (approximately 17 percent of the contract). <br /> <br />DISCUSSION <br />To improve safety, add ADA-compliant parking, and address residents' concerns, the project <br />installed five decorative lights, constructed two accessible parking stalls, installed wheel stops <br />and striping for 41 parking spots, and replaced approximately 135 linear feet of wooden fence <br />on the east side of the parking lot. The existing 16,000-square-foot gravel parking lot was <br />regraded, and a dust palliative was placed. In addition, two streetlights were installed on St <br />Mary Street, between the parking lot and Peters Avenue, to improve lighting on the sidewalk. <br />JJ Construction installed parking lot lighting, fencing, grading, and dust palliative. <br /> <br />The Public Works Department purchased and installed the wheel stops, placed striping, and <br />installed a concrete pad for ADA-compliant parking, a concrete driving approach and signage; <br />to address concerns with cut-through traffic a wooden railing was installed at the south end of <br />the parking lot entrance by Division Street to eliminate cut-through traffic access. The wheel <br />stops narrowed the open area of the parking lot, discouraging and reducing vehicles from <br />performing donut turns within the lot. <br /> <br />The project was completed at the contract amount without any change orders. <br /> <br />EQUITY AND SUSTAINABILITY <br />Approval of this action advances the City's Climate Action Plan (CAP) – Materials & <br />Consumption strategy – Reduce GHG emissions from materials management and <br />consumption, supporting regional waste reduction efforts, as recycled aggregates and LED <br />lighting were utilized. <br /> <br />OUTREACH <br />Nearby residents were informed by mail during the design and prior to the start of construction. <br />In response, work was added to the project during construction to address resident concerns <br />regarding cut-through parking lot traffic. <br /> <br />STRATEGIC PLAN ALIGNMENT <br />Approval of this action advances the ONE Pleasanton strategic plan goal of Investing in Our <br />Environment, Strategy 1 – Implement the four-year Capital Improvement Program (CIP) to <br />complete design and construction of budgeted capital projects and part of the Downtown <br />Parking Strategy and Implementation Plan adopted by City Council on April 18, 2017. <br /> <br /> <br />Page 189 of 228
The URL can be used to link to this page
Your browser does not support the video tag.