My WebLink
|
Help
|
About
|
Sign Out
CITY COUNCIL AGENDA PACKET
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2024
>
031924
>
CITY COUNCIL AGENDA PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/19/2024 2:26:47 PM
Creation date
3/19/2024 2:24:09 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
3/19/2024
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
228
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 3 of 7 <br />results will be included in the development of the 10-Year CIP and Water System Master Plan. <br /> <br />Condition Assessment & 10-Year CIP - IN PROGRESS <br />All on-site inspections of the physical infrastructure and analysis of the water infrastructure <br />based on the age and materials have been developed. This work will be used to develop a list <br />of infrastructure deficiencies based on the condition of the asset (pipelines, pump stations, <br />storage tanks et al.), to develop the primary components that comprise the 10-year CIP. The <br />City is in the process of implementing the prioritization and classification of each major <br />deficiency to generate the 10-year CIP with an estimated range of $135 million - $205 million in <br />needed improvements. Additional information about the prioritization process and preliminary <br />results are provided in the aforementioned December 19, 2022, agenda report titled: Receive <br />an update on the development of a Water System Management Plan. <br /> <br />Water Supply Alternative – City Ground Water Supply Project - IN PROGRESS <br />The Water Supply Alternative project identified and reviewed options to address PFAS in the <br />City's existing groundwater wells and outlined several alternatives to restore the City’s 3,500 <br />acre-feet groundwater pumping quota. The City is moving forward with a project to design, <br />construct, and operate two new groundwater wells in the Bernal sub-basin (as outlined in the <br />agenda report Water Supply Alternatives Study presented to the City Council on October 17, <br />2023). If during the feasibility process of test drilling and permitting with Zone 7, it is <br />determined that new groundwater wells are not feasible, then the City would pivot back to <br />constructing a reduced PFAS Treatment and Well Rehab project with a focus on <br />improvements to Well 8 (City PFAS Treatment and Well 8 Rehab Project). City staff has been <br />in continuous contact with Zone 7 as it is progressing on its groundwater modeling of the PFAS <br />plume and Well Master Plan. <br /> <br />Since October 2023, staff has had multiple conversations with Zone 7 and confirmed the <br />opportunity for collaboration, such that Zone 7 and City staff have developed a term sheet that <br />outlines the roles and expectations of the two agencies that will be the foundation of an <br />agreement to explore a groundwater well partnership. Collaboration with Zone 7 includes <br />evaluating the feasibility of designing, constructing, and operating multiple municipal wells in <br />the Bernal sub-basin and increasing the disinfection capacity at Zone 7's Hopyard treatment <br />facility to obtain additional groundwater supply for the region and recover the City’s <br />groundwater pumping quota (GPQ) of 3,500 acre-feet. Zone 7 would be the lead agency in the <br />development and operation of the project, and the City would support Zone 7 by paying its fair <br />share of costs related to its GPQ and assisting with necessary land rights. The City's GPQ <br />would be delivered by Zone 7 through its transmission system to City turnouts. Additional <br />improvements to the City's distribution system would likely be required to receive its GPQ from <br />turnouts rather than directly from City wells. Attachment 1 illustrates how exploring the <br />feasibility of a joint project with Zone 7 will tie into the City's overall plans for pursuing a <br />groundwater supply project and includes the following: <br /> <br />Phase 1 - Feasibility: This phase will be a joint effort by Zone 7 and the City. Efforts will include <br />a well-siting review for potential locations within the Bernal sub-basin and test drilling/water <br />modeling of these locations to determine the adequacy of water quality and yields. If the Bernal <br />sub-basin is feasible, a Basis of Design report will be prepared to determine the scope of <br />improvements and costs for a joint project. Additionally, preliminary terms for land rights and <br />design, construction, and operational cost sharing will be developed. Based on these findings, <br />the City will review the joint project's cost and advantages/disadvantages as compared to the <br />Page 154 of 228
The URL can be used to link to this page
Your browser does not support the video tag.