Laserfiche WebLink
Page 5 of 7 <br />improvements provided below) from the proceeds of tax-exempt obligations. <br /> <br />Connection Fee Study <br />The City collects fees from development through connection fees to cover the costs of the <br />infrastructure needed to support improvements to the City’s infrastructure. These connection <br />fees are designed to address the impact of new development on the existing system, and as <br />such the fees are paid by that new development and not existing customers. The City has not <br />updated its water and sewer connection fees since 1982 and has started the process to align <br />with other development fee updates that will be presented to the City Council in the coming <br />months. <br /> <br />Near-Term Water Improvements <br />The City has completed a complete hydraulic analysis of the water system and has identified <br />several core system deficiencies, including turnout capacities and pipelines, to meet the <br />current and future growth of the system. The loss of regular use of the City’s wells due to <br />PFAS created further deficiencies in the City’s system as the wells no longer provide water at <br />key locations within the City’s distribution system. The Water Supply Alternatives (WSA) <br />analysis was completed to determine the best solution to address the PFAS issue, and the <br />hydraulic model was utilized to identify the necessary distribution improvements for the various <br />water supply alternatives. Several sections of pipelines were identified as needing upgrades in <br />all the various alternatives which also aligned with the core system deficiencies. The <br />model was requested to identify the essential improvements that need to be constructed to <br />meet the forecasted system demands until the selected WSA can be put in service (an <br />assumed date of late 2028). The results identified three segments of the pipeline (Bernal <br />Avenue, Stoneridge Drive, and Sunol Boulevard), and improvements at Turnout No. 1 and No. <br />4 need to be completed and were termed “Near-Term Water Improvements.” Further identified <br />were emergency projects completed to meet the anticipated summer demands of 2023, <br />including temporary repairs to Turnout No. 1 to return it to service and installing a temporary <br />rental pump at Turnout No. 4 to increase the capacity of the turnout. <br /> <br />A condition assessment was completed on the water system and is currently being utilized in <br />the prioritization process in the development of the 10-Year Water CIP. The condition <br />assessment identified that water lines on Stoneridge Drive and Sunol Boulevard were near the <br />end of their useful life. The water lines on Stoneridge Drive and Sunol Blvd will be upsized to <br />accommodate the future removal of the older lines. <br /> <br />The Near-Term Water Improvements were broken into three bid packages to expedite the <br />work. <br /> <br />Bernal Avenue Water Line & Turnout No. 1 - IN PROGRESS <br />The first project is the Bernal Avenue 18-Inch Potable Water Main (F- 4 Line) & Turnout No. 1 <br />Project, CIP 24172, which was awarded for construction on January 16, 2024, for $2.2 million. <br />The project will install a new 18-inch water line in parallel to the existing 12-inch line from <br />Turnout No. 5 at the corner of Nevada Street to the Vineyard Booster Station at the <br />intersection of Vineyard and Bernal Avenue. The project also includes improvements at <br />Turnout No. 1 on Santa Rita Road that will replace the interior piping and equipment to Zone <br />7’s current standards and include a motorized control valve, flow meter, fluoride injection, and <br />instrumentation. The turnout was placed out of service after it was flooded, the equipment was <br />temporarily repaired, and the leak was repaired. Construction of the project began in February, <br />Page 156 of 228