My WebLink
|
Help
|
About
|
Sign Out
CITY COUNCIL AGENDA PACKET
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2024
>
031924
>
CITY COUNCIL AGENDA PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/19/2024 2:26:47 PM
Creation date
3/19/2024 2:24:09 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
3/19/2024
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
228
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 6 of 7 <br />with major construction impacts anticipated in late March. <br /> <br />Stoneridge and Sunol Water Lines & Turnout No. 4 - IN PROGRESS <br />The second project consists of Turnout No. 4 Replacement and Booster Station and <br />Stoneridge Drive 24-Inch Potable Water Main (F-1 Line), CIP No. 24171, and the Sunol <br />Boulevard 20-Inch Water Main (F-7 Line), CIP No. 24173, packaged together as Near-Term <br />Water Improvements. Bids opened on February 22 and the bid award is being presented to the <br />City Council on March 19 with an anticipated construction cost of $9.5 million. Work on <br />Stoneridge Drive occurs from Johnson Drive to Hopyard Road and will include installation of <br />approximately 3,200 linear feet of 24-inch fusible PVC water main; 450 linear feet of ductile <br />iron pipe ranging in diameter from 18-inch to 24-inch; site preparation for installation of a new <br />prefabricated booster station which is being procured separately; and installation of the <br />prefabricated booster station with new Zone 7 connection once fabrication is complete. Work <br />on Sunol Boulevard will extend from Sycamore Road to Bernal Avenue and includes the <br />installation of 4,500 linear feet of 20-inch ductile iron pipe connecting to the existing City <br />system at each end. The project will construct a larger turnout and booster station that will <br />increase the firm capacity and reliability of the turnout from 1,000 gallons per minute (gpm) to <br />5,200 gpm. Construction of the project is anticipated to start in April, with significant impacts <br />starting in May and continuing through December. <br /> <br />Turnout No. 4 Booster Station - IN PROGRESS <br />The third project is the procurement of the prepackaged booster station. Given the limited site <br />conditions, a prepackaged booster station will be built off-site and will be similar to the <br />Recycled Water Booster Station in Ken Mercer Sports Park. The consultants developed a <br />RFP, and proposals were received on January 19, 2024. The proposals ranged from $1.7 - <br />$1.8 million, as compared to the engineer’s estimate of $850,000. Further analysis and <br />updates to the RFP are being completed to reduce costs. It is anticipated the booster station <br />will not be installed until the spring 2025, and the temporary rental pump will continue to be in <br />place as needed. <br /> <br />EQUITY AND SUSTAINABILITY <br />The water system improvements and planning advance the City's Climate Action Plan 2.0 <br />(CAP) - Water Resources - Reduce GHG emissions from water usage (including conveyance) <br />and prepare community water resources for a changing climate, which will result in cost <br />savings, enhance water quality and availability, improve infrastructure, and increase resiliency. <br /> <br />OUTREACH <br />As the development of the WSMP and other major water projects continue to progress, <br />updates will be provided during scheduled City Council meetings so the community will be <br />informed. <br /> <br />STRATEGIC PLAN ALIGNMENT <br />Approval of this action advances the Citywide ONE Pleasanton Strategic Plan goal of Investing <br />in our Environment Strategy 1 - Implement the four-year Capital Improvement Program (CIP) <br />to complete design and construction of budgeted capital projects and Strategy 4 – Complete <br />the Water System Master Plan to reflect current and future operations and identify system <br />improvements and necessary maintenance. These efforts also advance the goal of Funding <br />our Future, Strategy 3 - Evaluate and update enterprise revenue sources, including utility <br />Page 157 of 228
The URL can be used to link to this page
Your browser does not support the video tag.