My WebLink
|
Help
|
About
|
Sign Out
CITY COUNCIL AGENDA PACKET
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2024
>
031924
>
CITY COUNCIL AGENDA PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/19/2024 2:26:47 PM
Creation date
3/19/2024 2:24:09 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
3/19/2024
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
228
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 5 of 9 <br />information based on various funding levels. The scenarios are listed in Table 3 below and are as follows: <br />Scenario 1 is the current budget programmed in the CIP, Scenario 2 is the cost to maintain a constant PCI <br />of 77, Scenario 3 is to increase the PCI 5 points to 82, Scenario 4 is the cost to improve the network to the <br />ideal PCI of 87, Scenario 5 is to maintain a constant backlog of $32 million, and Scenario 6 is if no funding <br />would take place. The results indicate that at current funding levels the PCI is expected to drop an <br />additional 2 points and increase the backlog to $46 million after five years. Of note, the table does not <br />include the costs for concrete improvements, which are a necessary part of the street maintenance <br />program. <br /> <br /> <br />Table 3: Scenarios <br />(Table ES-2 in Attachment 1, page 6) <br /> <br /> <br /> <br />The City’s street network PCI has been slowly declining over the last 10 years (as shown in Table 4 below) <br />but was sustaining the backlog of work at the expended funding levels. The costs in the PMP report <br />identified a significant increase of $2 million required, for a total of $6 million, for the Annual Street <br />Resurfacing and Annual Slurry Seal to maintain the current PCI. In addition, the annual costs for necessary <br />concrete improvements are dramatically increasing. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Page 164 of 228
The URL can be used to link to this page
Your browser does not support the video tag.