My WebLink
|
Help
|
About
|
Sign Out
CITY COUNCIL AGENDA PACKET
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2024
>
031924
>
CITY COUNCIL AGENDA PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/19/2024 2:26:47 PM
Creation date
3/19/2024 2:24:09 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
3/19/2024
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
228
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 4 of 9 <br />including Measure B/BB Local Streets and Roads and Measure F Vehicle Registration Fee <br />(VRF). In addition, for the past 15 years, the City has received grant funding of nearly$1 <br />million dollars every few years from federal stimulus programs like the American Recovery <br />Act, and local grant funding under the One Bay Area Grant (OBAG) that consolidated many <br />smaller local grant programs. Changes in the OBAG program removed the direct payment <br />based on population, used in Cycles I and II, to a grant application targeting goals established <br />by the program; the City of Pleasanton does not score as competitively as other communities <br />under these application goals. <br /> <br />DISCUSSION <br />The City’s street network pavement, valued at $306 million (excluding concrete such as curb <br />and gutter and sidewalks, bridges, and traffic signals and signs), is the largest capital asset <br />the City owns. The 2023 PMP report lowered the network average by two points to a PCI of 77 <br />and increased the backlog of work by $10 million from $22 million to $32 million from the 2021 <br />PMP report, an unexpected decrease in the network’s health. Pleasanton’s streets still rank in <br />“good to excellent” condition and are above the average San Francisco Bay Area road rating <br />of PCI 67. A reduction in PCI rating and an increase in the backlog of work is a commonality <br />across all Bay Area communities. Figure 2 compares the local agencies, with only Dublin and <br />Livermore having higher PCI than Pleasanton; the rating is reflective of the newer streets from <br />more recent development in Dublin and the increased funding for Livermore’s street network <br />in the past few years. <br /> <br />Figure 2: Local Agency PCI Comparison <br />(Figure 6 in Attachment 1, page 17) <br /> <br /> <br />The PMP report includes six standard budget scenarios for the next five years to provide valuable “what-if” <br />Page 163 of 228
The URL can be used to link to this page
Your browser does not support the video tag.