<br /> <br />Page | 39 <br /> <br />Pavement Management Technical Assistance (P-TAP) Round 24 <br />CONCLUSIONS <br />The City of Pleasanton currently has 209.34 centerline miles of paved roads or 507.51 lane miles. This <br />asset comprises approximately 46.2 million square feet of pavement and is worth roughly $306 million <br />to replace. After updating the City’s pavement management system with inspections and recent <br />maintenance and rehabilitation treatments, the City’s overall network condition is 77 PCI. <br />Approximately 71.5% of the City’s road network has a PCI of 70 or better. The City’s current backlog is <br />about $31.7 million. <br /> <br />The first option the City should consider is implementing the “Unconstrained Funding Scenario.” This <br />scenario requires an average budget of $14.9 million annually or $74.5 million for five years. The effects <br />of this budget increase the network PCI to 87 (Figure 20), while the backlog decreases to $1.1 million <br />(Figure 21) at the end of five years. 98.5% of City streets will have a PCI of 70 and above (Table 18). <br /> <br />The second option is implementing the “Plus 5 PCI Increase Scenario.” Results show that the network <br />increased to 82 in five years (Figure 20). This budget would cost $10.5 million annually or $52.7 million <br />over five years. The backlog decreases to $20.4 million (Figure 21). This action will result in 88.9% of <br />city streets having a PCI of 70 and above (Table 18). <br /> <br />The third option is implementing the “Constant Deferred Maintenance Scenario.” Results from this <br />scenario show that the overall network PCI increases to 78 (Figure 20) while the backlog remains <br />constant at $31.7 million (Figure 21). This scenario would cost $7.2 million annually or $35.8 million <br />for five years. Approximately 77.8% of the City’s pavement will have a 70 or better (Table 18). <br /> <br />The fourth option is using the “Constant PCI Scenario.” This scenario averages $6.9 million annually or <br />$34.7 million over five years. Results show that the network remains constant at 77 PCI (Figure 20). <br />The backlog for this scenario increases to $36.1 million (Figure 21). 75.2% of City streets will have a <br />PCI of 70 or better (Table 18). <br /> <br />Page 207 of 228